Manufacturing And Production Technology The grinding operation is a Forming operation Shaping operation Dressing operation Surface finishing operation Forming operation Shaping operation Dressing operation Surface finishing operation ANSWER DOWNLOAD EXAMIANS APP
Manufacturing And Production Technology If a particular Fe-C alloy contains less than 0.83% carbon, it is called Cast iron High speed steel Hypo eutectoid steel Hyper eutectoid steel Cast iron High speed steel Hypo eutectoid steel Hyper eutectoid steel ANSWER DOWNLOAD EXAMIANS APP
Manufacturing And Production Technology A twist drill is specified by its Shank, material and diameter Any one of these Shank, lip angle and size of flute Material, length of body and helix angle Shank, material and diameter Any one of these Shank, lip angle and size of flute Material, length of body and helix angle ANSWER DOWNLOAD EXAMIANS APP
Manufacturing And Production Technology For machining a mild steel workpiece by a high speed steel tool, the average cutting speed is 15 m/min 5 m/min 30 m/min 10 m/min 15 m/min 5 m/min 30 m/min 10 m/min ANSWER DOWNLOAD EXAMIANS APP
Manufacturing And Production Technology In metal cutting operations, the shear angle is the angle made by the shear plane with the Perpendicular to the direction of the tool axis Central plane of the workpiece Direction of tool travel Direction of the tool axis Perpendicular to the direction of the tool axis Central plane of the workpiece Direction of tool travel Direction of the tool axis ANSWER DOWNLOAD EXAMIANS APP
Manufacturing And Production Technology Volume of a cube of side ‘l’ and volume of a sphere of radius ‘r’ are equal. Both the cube and the sphere are solid and of same material. They are being cast. The ratio of the solidification time of the cube to the same of the sphere is (4π/6)³ × (r/l)⁶ (4π/6) × (r/l)² (4π/6)² × (r/l)⁴ (4π/6)² × (r/l)³ (4π/6)³ × (r/l)⁶ (4π/6) × (r/l)² (4π/6)² × (r/l)⁴ (4π/6)² × (r/l)³ ANSWER DOWNLOAD EXAMIANS APP