Engineering Drawing The foundation contractor will work with the following architectural plans. Site plan Foundation All of these Floor plan Site plan Foundation All of these Floor plan ANSWER DOWNLOAD EXAMIANS APP
Engineering Drawing Once a drawing is determined to be complete, the title block is used to document the change from: A draft to a finished drawing A finished to a working drawing A working drawing to a draft An assembly to a finished drawing A draft to a finished drawing A finished to a working drawing A working drawing to a draft An assembly to a finished drawing ANSWER DOWNLOAD EXAMIANS APP
Engineering Drawing Inserting blocks into a drawing file usually requires exacting placement. The drafter should insure that ________ is turned on. Ortho Grid O Snaps Dynamic Input Ortho Grid O Snaps Dynamic Input ANSWER DOWNLOAD EXAMIANS APP
Engineering Drawing Referring to the fractional inches to decimal inches to millimeter conversion chart on page 55 what is the equivalent mm measurement of 3/16 inch. 1.906 4.7625 5.958 14.6844 1.906 4.7625 5.958 14.6844 ANSWER DOWNLOAD EXAMIANS APP
Engineering Drawing These are vertical distances above a common datum, reference plane, or point: Elevations Traverse Plats Profiles Elevations Traverse Plats Profiles ANSWER DOWNLOAD EXAMIANS APP
Engineering Drawing To avoid having to dimension to a hidden feature the drafter can utilize a ________ section. Whole Half All of these Broken out Whole Half All of these Broken out ANSWER DOWNLOAD EXAMIANS APP