Engineering Drawing A ________ is the person responsible for verifying that the drawings in a project set are free of mistakes. Checker CAD trainee Receptionist Client Checker CAD trainee Receptionist Client ANSWER DOWNLOAD EXAMIANS APP
Engineering Drawing In an assembly section, these parts should have their section lines left out or shown solid black: All fasteners Bolts Thin parts Rivets All fasteners Bolts Thin parts Rivets ANSWER DOWNLOAD EXAMIANS APP
Engineering Drawing When creating a block the drafter needs to pay particular attention to selecting a base point because it determines the __________. Rotation angle Scale Insertion point Color Rotation angle Scale Insertion point Color ANSWER DOWNLOAD EXAMIANS APP
Engineering Drawing CAD programs which incorporate parametric modeling utilize a system in which the dimensions control the ________. Perspective of the model Shading used to render the model Size and shape of the model features All of these Perspective of the model Shading used to render the model Size and shape of the model features All of these ANSWER DOWNLOAD EXAMIANS APP
Engineering Drawing In order to set drawing limits for a 'C' size architectural drawing the drafter should set the limits to ________. 0, 0 and 18, 24 0, 0 and 34, 24 0, 0 and 2, 9 0, 0 and 17, 11 0, 0 and 18, 24 0, 0 and 34, 24 0, 0 and 2, 9 0, 0 and 17, 11 ANSWER DOWNLOAD EXAMIANS APP
Engineering Drawing In this type of section, one quarter of the object is removed: Quarter section Half section Revolved section Removed section Quarter section Half section Revolved section Removed section ANSWER DOWNLOAD EXAMIANS APP