Concrete Technology and Design of Concrete Structures The factor of safety for None of these steel is higher than that for concrete steel is lower than that for concrete steel and concrete are same None of these steel is higher than that for concrete steel is lower than that for concrete steel and concrete are same ANSWER DOWNLOAD EXAMIANS APP
Concrete Technology and Design of Concrete Structures For walls, columns and vertical faces of all structural members, the form work is generally removed after 24 to 48 hours 14 days 3 days 7 days 24 to 48 hours 14 days 3 days 7 days ANSWER DOWNLOAD EXAMIANS APP
Concrete Technology and Design of Concrete Structures When shear stress exceeds the permissible limit in a slab, then it is reduced by Using thinner bars but more in number Providing shear reinforcement Using high strength steel Increasing the depth Using thinner bars but more in number Providing shear reinforcement Using high strength steel Increasing the depth ANSWER DOWNLOAD EXAMIANS APP
Concrete Technology and Design of Concrete Structures The critical section for finding maximum bending moment for footing under masonry wall is located at the edge of the wall at a distance equal to effective depth of footing from the edge of the wall halfway between the middle and edge of the wall at the middle of the wall at the edge of the wall at a distance equal to effective depth of footing from the edge of the wall halfway between the middle and edge of the wall at the middle of the wall ANSWER DOWNLOAD EXAMIANS APP
Concrete Technology and Design of Concrete Structures Maximum quantity of water needed per 50 kg of cement for M 15 grade of concrete is 30 liters 28 liters 32 liters 34 liters 30 liters 28 liters 32 liters 34 liters ANSWER DOWNLOAD EXAMIANS APP
Concrete Technology and Design of Concrete Structures In case of hand mixing of concrete, the extra cement to be added is 15% 10% 5% 20% 15% 10% 5% 20% ANSWER DOWNLOAD EXAMIANS APP