Power Systems The factor affecting run off are rain fall pattern, shape and size of catchment area. the topography and nature of soil in the catchment area. amount of vegetation and weather condition in the catchment area. all of above. rain fall pattern, shape and size of catchment area. the topography and nature of soil in the catchment area. amount of vegetation and weather condition in the catchment area. all of above. ANSWER DOWNLOAD EXAMIANS APP
Power Systems Which one of the following relays has the capability of anticipating the possible major fault in a transformer? Over fluxing relay Over current relay Differential relay Buchholz relay Over fluxing relay Over current relay Differential relay Buchholz relay ANSWER DOWNLOAD EXAMIANS APP
Power Systems a 50 Hz, 3-phase synchronous generator has inductance per phase of 15 mH. The capacitance of the generator and circuit breaker is 0.002 µF. What is its natural frequency? 29 kHz 29 MHz 2.9 kHz 290 kHz 29 kHz 29 MHz 2.9 kHz 290 kHz ANSWER DOWNLOAD EXAMIANS APP
Power Systems Which power plant cannot have single unit of 100 MW capacity Diesel engine plant. Steam power plant. Nuclear power plant. Hydro electric power plant. Diesel engine plant. Steam power plant. Nuclear power plant. Hydro electric power plant. ANSWER DOWNLOAD EXAMIANS APP
Power Systems A 200 MVA alternator operated at no load at frequency of 50 Hz, it has inertia constant of 5 MWsec/MVA and governing system has a time delay of 0.6 sec. If the load of 50 MW is suddenly applied then find the frequency deviation during this time? -0.76 Hz 0.85 Hz -0.85 Hz 0.76 Hz -0.76 Hz 0.85 Hz -0.85 Hz 0.76 Hz ANSWER DOWNLOAD EXAMIANS APP
Power Systems Advantages of gauss siedel method is/are number of iterations are less calculation time for each iteration is less applicable for large power system network All of these number of iterations are less calculation time for each iteration is less applicable for large power system network All of these ANSWER DOWNLOAD EXAMIANS APP