Power Systems The factor affecting run off are the topography and nature of soil in the catchment area. all of above. rain fall pattern, shape and size of catchment area. amount of vegetation and weather condition in the catchment area. the topography and nature of soil in the catchment area. all of above. rain fall pattern, shape and size of catchment area. amount of vegetation and weather condition in the catchment area. ANSWER DOWNLOAD EXAMIANS APP
Power Systems The zero sequence current of a generator for line to ground fault is j3 pu. Then the current through the neutral during the fault is j1 pu j6 pu j9 pu j3 pu j1 pu j6 pu j9 pu j3 pu ANSWER DOWNLOAD EXAMIANS APP
Power Systems The generating station suitable to operate as peak load plant is Nuclear power station. Power station. Thermal power station. Pumped storage. Nuclear power station. Power station. Thermal power station. Pumped storage. ANSWER DOWNLOAD EXAMIANS APP
Power Systems How to find the total number of strands (N) when number of layers (x) are given Total number of strands N = 3x² + 3x - 1 Total number of strands N = 3x² - 3x - 1 Total number of strands N = 3x² + 3x + 1 Total number of strands N = 3x² - 3x + 1 Total number of strands N = 3x² + 3x - 1 Total number of strands N = 3x² - 3x - 1 Total number of strands N = 3x² + 3x + 1 Total number of strands N = 3x² - 3x + 1 ANSWER DOWNLOAD EXAMIANS APP
Power Systems If the rated receiving end voltage is 33 kV, then what are the limits for safe operation of equipments? 25 to 35 kV 31.35 to 34.65 kV any voltage above 33 kV 33 to 50 kV 25 to 35 kV 31.35 to 34.65 kV any voltage above 33 kV 33 to 50 kV ANSWER DOWNLOAD EXAMIANS APP
Power Systems A generated station has a maximum demand of 30 MW, a load factor of 60% and a plant capacity factor of 50%. The reserve capacity of the plant is 12 MW 6 MW 5 MW 10 MW 12 MW 6 MW 5 MW 10 MW ANSWER DOWNLOAD EXAMIANS APP