Economics of Power Generation

Economics of Power Generation
The best location of p. f. Correction equipment to be installed on the transmission line is at the

None of the listed here
Sending end
Receiving end
Middle end

ANSWER DOWNLOAD EXAMIANS APP

Economics of Power Generation
A load draws a power of 10 kW at a power factor of 0.707 lagging. The lagging kVAR drawn from the supply will be

5 kVAR
15kVAR
10 kVAR
20 kVAR

ANSWER DOWNLOAD EXAMIANS APP

Economics of Power Generation
In a power plant if the maximum demand on the plant is equal to the plant capacity, then

Load factor will be nearly 60%
Diversity factor will be unity
Plant reserve capacity will be zero
Load factor will be unity

ANSWER DOWNLOAD EXAMIANS APP

Economics of Power Generation
A consumer has to pay lesser fixed charges in

maximum demand tariff
two part tariff
any of the above
flat rate tariff

ANSWER DOWNLOAD EXAMIANS APP

Economics of Power Generation
Which of the following devices may be used to provide protection against lightening over voltages ?

Horn gaps
Rod gaps
All of these
Surge absorbers

ANSWER DOWNLOAD EXAMIANS APP

Economics of Power Generation
The annual deposit is _____ in sinking fund method as compared to straight line method.

The same
Smaller
Greater
None of the listed here

ANSWER DOWNLOAD EXAMIANS APP
MORE MCQ ON Economics of Power Generation

DOWNLOAD APP

  • APPLE
    from app store
  • ANDROID
    from play store

SEARCH

LOGIN HERE


  • GOOGLE

FIND US

  • 1.70K
    FOLLOW US
  • EXAMIANSSTUDY FOR YOUR DREAMS.
  • SUPPORT :SUPPORT EMAIL ACCOUNT : examians@yahoo.com

OTHER WEBSITES

  • GUJARATI MCQ
  • ACCOUNTIANS

QUICK LINKS

  • HOME
  • QUIZ
  • PRIVACY POLICY
  • DISCLAIMER
  • TERMS & CONDITIONS
  • CONTACT US
↑