Economics of Power Generation The best location of p. f. Correction equipment to be installed on the transmission line is at the Middle end None of the listed here Sending end Receiving end Middle end None of the listed here Sending end Receiving end ANSWER DOWNLOAD EXAMIANS APP
Economics of Power Generation ________ is invariably used for peak load None of these Pumped storage plant Steam turbine plant Nuclear power plant None of these Pumped storage plant Steam turbine plant Nuclear power plant ANSWER DOWNLOAD EXAMIANS APP
Economics of Power Generation In the diminishing value method for calculating depreciation, the annual depreciation charge is independent of The rate of interest Initial value of equipment Scrap value Useful life of equipment The rate of interest Initial value of equipment Scrap value Useful life of equipment ANSWER DOWNLOAD EXAMIANS APP
Economics of Power Generation ______ is the reserved generating capacity available for service under emergency conditions which is not kept in operation but but in working order. Spinning reserve Hot reserve Cold reserve Firm power Spinning reserve Hot reserve Cold reserve Firm power ANSWER DOWNLOAD EXAMIANS APP
Economics of Power Generation Which plant can never have 100 percent load factor? Nuclear power plant Peak load plant Base load plant Hydroelectric plant Nuclear power plant Peak load plant Base load plant Hydroelectric plant ANSWER DOWNLOAD EXAMIANS APP
Economics of Power Generation Large capacity generators are invariably Natural air cooled Water cooled Hydrogen cooled Forced air cooled Natural air cooled Water cooled Hydrogen cooled Forced air cooled ANSWER DOWNLOAD EXAMIANS APP