Economics of Power Generation When the plant restors to load shedding it can be conclucted that Diversity factor is zero Daily load factor is unity Plant is under repairs Peak demand is more than the installed capacity Diversity factor is zero Daily load factor is unity Plant is under repairs Peak demand is more than the installed capacity ANSWER DOWNLOAD EXAMIANS APP
Economics of Power Generation For given active power and voltage, the current drawn is minimum when the value of power factor is O. 8 lead 0.8 lag Unity 0.75 lag O. 8 lead 0.8 lag Unity 0.75 lag ANSWER DOWNLOAD EXAMIANS APP
Economics of Power Generation When the demand of consumer is not met by a power plant, it will resort to which of the following? Load shedding Penalising high load consumers by increasing the charges for electricity Efficient plant operation Power factor improvement at the generators Load shedding Penalising high load consumers by increasing the charges for electricity Efficient plant operation Power factor improvement at the generators ANSWER DOWNLOAD EXAMIANS APP
Economics of Power Generation Alternators and transformers are rated in None of the listed here kVAR kW kVA None of the listed here kVAR kW kVA ANSWER DOWNLOAD EXAMIANS APP
Economics of Power Generation Generators for peak load plants are usually designed for maximum efficiency at 25 to 50 % percent full load 25 percent overload Full load 50 to 75 % percent full load 25 to 50 % percent full load 25 percent overload Full load 50 to 75 % percent full load ANSWER DOWNLOAD EXAMIANS APP
Economics of Power Generation Depreciation charge are high in case of Hydroelectric plant Thermal plant Diesel plant Diesel plant Hydroelectric plant Thermal plant Diesel plant Diesel plant ANSWER DOWNLOAD EXAMIANS APP