Waste Water Engineering The arrangement made for passing the sewer line below an obstruction below the hydraulic gradient lines called all of these Sag pipe Inverted syphon Depressed sewer all of these Sag pipe Inverted syphon Depressed sewer ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering For providing an Indian type W.C., the R.C.C. slabs in the toilet portion Should be sunk by 20 cm Need not be sunk Should be sunk by 50 cm Should be kept 20 cm above the adjacent portion Should be sunk by 20 cm Need not be sunk Should be sunk by 50 cm Should be kept 20 cm above the adjacent portion ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The sewage is pumped up All listed here From low lying areas From basements From flat areas All listed here From low lying areas From basements From flat areas ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The moisture content of sludge is reduced from 90% to 80% in a sludge digestion tank. The percentage decrease in the volume of sludge, is 0.5 0.1 0.05 0.25 0.5 0.1 0.05 0.25 ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The standard B.O.D. of water is taken for 2 days 1 day 5 days 3 days 2 days 1 day 5 days 3 days ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering In very first stage of decomposition of the organic matter in sewage Carbondioxide is formed Nitrates are formed Ammonia is formed Nitrites are formed Carbondioxide is formed Nitrates are formed Ammonia is formed Nitrites are formed ANSWER DOWNLOAD EXAMIANS APP