perimeter = total cost / cost per m = 10080 /20 = 504mside of the square = 504/4 = 126mbreadth of the pavement = 3mside of inner square = 126 - 6 = 120marea of the pavement = (126 x126) - (120 x 120) = 246 x 6 sq mcost of pavement = 246*6*50 = Rs. 73800
Let original length = x metres and original breadth = y metres. Original area = xy sq.m Increased length = 120 100 and Increased breadth = 120 100 New area = 120 100 x * 120 100 y = 36 25 x y m 2 The difference between the Original area and New area is: 36 25 x y - x y 11 25 x y Increase % = 11 25 x y x y * 100 = 44%