Nuclear Power Engineering
Tarapur atomic power station

All of these
Is the first power reactor in India, which became critical in 1969
Has an installed capacity of 400 MW
Has two boiling water reactors of American design

ANSWER DOWNLOAD EXAMIANS APP

Nuclear Power Engineering
Commercial power generation from fusion reactor is not yet possible, because

It is difficult to control fusion reaction
It is difficult to initiate fusion reaction
Quantity of fuel required for initiating fusion reaction is prohibitively high
The fuel required (e.g. deuterium and tritium) is scarce

ANSWER DOWNLOAD EXAMIANS APP