Surveying Systematic errors Are also known as cumulative errors Can be removed by applying corrections to the observed values Always follow some definite mathematical law All listed here Are also known as cumulative errors Can be removed by applying corrections to the observed values Always follow some definite mathematical law All listed here ANSWER DOWNLOAD EXAMIANS APP
Surveying Height of instrument method of levelling is less accurate than rise and fall method quicker and less tedious for large number of intermediate sights None of these more accurate than rise and fall method less accurate than rise and fall method quicker and less tedious for large number of intermediate sights None of these more accurate than rise and fall method ANSWER DOWNLOAD EXAMIANS APP
Surveying In direct method of contouring, the process of locating or identifying points lying on a contour is called horizontal control vertical control centring ranging horizontal control vertical control centring ranging ANSWER DOWNLOAD EXAMIANS APP
Surveying For a tacheometer the additive and multi-plying constants are respectively 100 and 0 0 and 0 100 and 100 0 and 100 100 and 0 0 and 0 100 and 100 0 and 100 ANSWER DOWNLOAD EXAMIANS APP
Surveying The Polaris remains below horizon at 50° N Latitude Equator 5° S latitude 10° N 50° N Latitude Equator 5° S latitude 10° N ANSWER DOWNLOAD EXAMIANS APP
Surveying The prime vertical passes through All of these The west point of the horizon The east point of the horizon The zenith point of the observer All of these The west point of the horizon The east point of the horizon The zenith point of the observer ANSWER DOWNLOAD EXAMIANS APP