GETCO Exam Paper (11-06-2017) Steady state stability of a power system is improved by decreasing generator inertia reducing fault clearing time using double circuit line instead of single circuit line single pole switching decreasing generator inertia reducing fault clearing time using double circuit line instead of single circuit line single pole switching ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (11-06-2017) Ferranti effect happens in transmission line when the line is long and unloaded long and loaded short and loaded none long and unloaded long and loaded short and loaded none ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (11-06-2017) The rated voltage of a 3-phase power system is given as rms line-to-line voltage peak line-to-peak voltage peak phase voltage rms phase voltage rms line-to-line voltage peak line-to-peak voltage peak phase voltage rms phase voltage ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (11-06-2017) In a transmission system, the weight of copper used is proportional to 1/E 1/E2 E2 E 1/E 1/E2 E2 E ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (11-06-2017) In thermal power plants, the pressure in the working fluid cycle is developed by feed water pump condenser superheater turbine feed water pump condenser superheater turbine ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (11-06-2017) In a 3-phase supply, floating neutral is undesirable because it may result in _____ across the load unequal line voltage none high voltage low voltage unequal line voltage none high voltage low voltage ANSWER DOWNLOAD EXAMIANS APP