GETCO Exam Paper (11-06-2017) Load shedding is done for power factor improvement efficient operation of equipment repairing of machines reducing peak demand on the system power factor improvement efficient operation of equipment repairing of machines reducing peak demand on the system ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (11-06-2017) If the length of a cable is doubled, its capacitance becomes double becomes one half remains unchanged becomes one-fourth becomes double becomes one half remains unchanged becomes one-fourth ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (11-06-2017) Control rods used in nuclear reactors are made of lead beryllium boron zirconium lead beryllium boron zirconium ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (11-06-2017) A power system needs injection of VARs at off-peak load both peak and off-peak load full load peak load off-peak load both peak and off-peak load full load peak load ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (11-06-2017) The effect of corona is increased reactance increased energy loss all increased inductance increased reactance increased energy loss all increased inductance ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (11-06-2017) For an overhead line, the surge impedance is taken as 500-1000 Ω 70-80 Ω 100-200 Ω 20-40 Ω 500-1000 Ω 70-80 Ω 100-200 Ω 20-40 Ω ANSWER DOWNLOAD EXAMIANS APP