GETCO Exam Paper (11-06-2017) Load shedding is done for efficient operation of equipment power factor improvement repairing of machines reducing peak demand on the system efficient operation of equipment power factor improvement repairing of machines reducing peak demand on the system ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (11-06-2017) The charging current in the cables leads the voltage by 90˚ lags the voltage by 90˚ leads the voltage by 180˚ lags the voltage by 180˚ leads the voltage by 90˚ lags the voltage by 90˚ leads the voltage by 180˚ lags the voltage by 180˚ ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (11-06-2017) For the protection of power system against travelling waves, we use surge diverters earthing screens overhead ground wires None of these surge diverters earthing screens overhead ground wires None of these ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (11-06-2017) As the size of a thermal generating unit increases, the capital cost per kW of installed capacity decreases may increase of decrease remain the same increases decreases may increase of decrease remain the same increases ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (11-06-2017) Give synonym: Cancel Allow Break Abolish Approve Allow Break Abolish Approve ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (11-06-2017) Cells are connected in parallel in order to increase the voltage rating life of the cells current capacity efficiency voltage rating life of the cells current capacity efficiency ANSWER DOWNLOAD EXAMIANS APP