Environmental Engineering Sewerage system is usually designed for 25 years 26 years 28 years 27 years 25 years 26 years 28 years 27 years ANSWER DOWNLOAD EXAMIANS APP
Environmental Engineering The overflow rate for plain sedimentation tanks is about 1500 to 2000 liters/hour/m² 1250 to 1500 liters/hour/m² 1000 to 1250 liters/hour/ m² 500 to 750 liters/hour/ m² 1500 to 2000 liters/hour/m² 1250 to 1500 liters/hour/m² 1000 to 1250 liters/hour/ m² 500 to 750 liters/hour/ m² ANSWER DOWNLOAD EXAMIANS APP
Environmental Engineering The method of analysis of distribution system in which the domestic supply is neglected and fire demand is considered is Electrical analysis method Equivalent pipe method Circle method Hardy cross method Electrical analysis method Equivalent pipe method Circle method Hardy cross method ANSWER DOWNLOAD EXAMIANS APP
Environmental Engineering The pathogens can be killed by Oxidation Nitrification None of these Chlorination Oxidation Nitrification None of these Chlorination ANSWER DOWNLOAD EXAMIANS APP
Environmental Engineering Hardy cross method of analysis of distribution system (i) Involves successive trials (ii) Takes economic aspects into account (iii) Is time consuming All are correct (i) and (ii) (i) and (iii) Only (i) All are correct (i) and (ii) (i) and (iii) Only (i) ANSWER DOWNLOAD EXAMIANS APP
Environmental Engineering The process in which the chlorination is done beyond the break point is known as Pre-chlorination Post chlorination Super chlorination Break point chlorination Pre-chlorination Post chlorination Super chlorination Break point chlorination ANSWER DOWNLOAD EXAMIANS APP