Environmental Engineering

Environmental Engineering
Sewerage system is usually designed for

25 years
26 years
28 years
27 years

ANSWER DOWNLOAD EXAMIANS APP

Environmental Engineering
The overflow rate for plain sedimentation tanks is about

1500 to 2000 liters/hour/m²
1250 to 1500 liters/hour/m²
1000 to 1250 liters/hour/ m²
500 to 750 liters/hour/ m²

ANSWER DOWNLOAD EXAMIANS APP

Environmental Engineering
The method of analysis of distribution system in which the domestic supply is neglected and fire demand is considered is

Electrical analysis method
Equivalent pipe method
Circle method
Hardy cross method

ANSWER DOWNLOAD EXAMIANS APP

Environmental Engineering
The pathogens can be killed by

Oxidation
Nitrification
None of these
Chlorination

ANSWER DOWNLOAD EXAMIANS APP

Environmental Engineering
Hardy cross method of analysis of distribution system (i) Involves successive trials (ii) Takes economic aspects into account (iii) Is time consuming

All are correct
(i) and (ii)
(i) and (iii)
Only (i)

ANSWER DOWNLOAD EXAMIANS APP

Environmental Engineering
The process in which the chlorination is done beyond the break point is known as

Pre-chlorination
Post chlorination
Super chlorination
Break point chlorination

ANSWER DOWNLOAD EXAMIANS APP
MORE MCQ ON Environmental Engineering

DOWNLOAD APP

  • APPLE
    from app store
  • ANDROID
    from play store

SEARCH

LOGIN HERE


  • GOOGLE

FIND US

  • 1.70K
    FOLLOW US
  • EXAMIANSSTUDY FOR YOUR DREAMS.
  • SUPPORT :SUPPORT EMAIL ACCOUNT : examians@yahoo.com

OTHER WEBSITES

  • GUJARATI MCQ
  • ACCOUNTIANS

QUICK LINKS

  • HOME
  • QUIZ
  • PRIVACY POLICY
  • DISCLAIMER
  • TERMS & CONDITIONS
  • CONTACT US
↑