GETCO Exam Paper (11-06-2017) SCADA is data monitoring and control real time data acquisition and processing all data storing data monitoring and control real time data acquisition and processing all data storing ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (11-06-2017) Ferranti effect happens in transmission line when the line is none short and loaded long and unloaded long and loaded none short and loaded long and unloaded long and loaded ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (11-06-2017) The power factor of an open ended cable can be improved by increasing the insulation resistance increasing the conductor resistance decreasing the capacitance increasing the capacitance increasing the insulation resistance increasing the conductor resistance decreasing the capacitance increasing the capacitance ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (11-06-2017) The rated voltage of a 3-phase power system is given as rms line-to-line voltage rms phase voltage peak line-to-peak voltage peak phase voltage rms line-to-line voltage rms phase voltage peak line-to-peak voltage peak phase voltage ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (11-06-2017) A power system needs injection of VARs at full load peak load off-peak load both peak and off-peak load full load peak load off-peak load both peak and off-peak load ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (11-06-2017) The most accurate and versatile method of achieving power compensation is by using saturable reactor with capacitor bank switched capacitor with controlled reactors switched capacitors fixed capacitor with controlled reactor saturable reactor with capacitor bank switched capacitor with controlled reactors switched capacitors fixed capacitor with controlled reactor ANSWER DOWNLOAD EXAMIANS APP