GETCO Exam Paper (11-06-2017) In a load duration curve for an integrated power system, the uppermost crest represents the energy contributed by which one of the following? Peaking hydro or gas turbine stations Major thermal stations Non-conventional power stations Base power stations Peaking hydro or gas turbine stations Major thermal stations Non-conventional power stations Base power stations ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (11-06-2017) Cells are connected in parallel in order to increase the voltage rating current capacity efficiency life of the cells voltage rating current capacity efficiency life of the cells ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (11-06-2017) Lamps in street lighting are all connected in parallel end-to-end series-parallel series parallel end-to-end series-parallel series ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (11-06-2017) In air blast circuit breaker resistance switching is used to change the fault current power factor control the CB operating time damp out the fast transient reduce the magnitude of fault current change the fault current power factor control the CB operating time damp out the fast transient reduce the magnitude of fault current ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (11-06-2017) SCADA is data storing all real time data acquisition and processing data monitoring and control data storing all real time data acquisition and processing data monitoring and control ANSWER DOWNLOAD EXAMIANS APP