GETCO Exam Paper (11-06-2017) Give synonym: Cease Stop Dull Begin Create Stop Dull Begin Create ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (11-06-2017) Load shedding is done for efficient operation of equipment reducing peak demand on the system power factor improvement repairing of machines efficient operation of equipment reducing peak demand on the system power factor improvement repairing of machines ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (11-06-2017) Arc in a circuit breaker is interrupted at maximum current minimum voltage maximum voltage zero current maximum current minimum voltage maximum voltage zero current ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (11-06-2017) Give synonym: Cancel Break Approve Abolish Allow Break Approve Abolish Allow ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (11-06-2017) Water hammer occurs in surge tank penstock turbine casing draft tube surge tank penstock turbine casing draft tube ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (11-06-2017) In a 3-phase, 4-wire cable the cross sectional area of neutral conductor is equal to the area of phase conductor double the area of phase conductor 1.5 times the area of phase conductor half of the area of phase conductor equal to the area of phase conductor double the area of phase conductor 1.5 times the area of phase conductor half of the area of phase conductor ANSWER EXPLANATION DOWNLOAD EXAMIANS APP Answer as per answer key provided is “double the area of phase conductor”. But neutral wire can be half of phase.