What does symbol 'D' imply in work study? Inspection Permanent storage Transport Delay/temporary storage TRUE ANSWER : ? YOUR ANSWER : ?
In the Emerson efficiency plan, a worker receives only his daily wage and no bonus is paid till his efficiency reaches 0.5 0.8 0.75 0.6667 TRUE ANSWER : ? YOUR ANSWER : ?
An event is indicated on the network by A number enclosed in a circle or a square A dotted line A straight line A straight line with circles at the ends TRUE ANSWER : ? YOUR ANSWER : ?
The time required to complete a job is established and a bonus is paid to the worker based on the exact % of time saved. This type of incentive plan is known as Dry work Plan Rowan Plan Halsey Premium Plan Taylor Plan TRUE ANSWER : ? YOUR ANSWER : ?
Abbreviated work factor data is applied for All of these Maintenance operation Packing and shipping operation Material handling operation TRUE ANSWER : ? YOUR ANSWER : ?
What does symbol 'V' employ in work study Delay/ temporary Storage Operation Inspection Permanent storage TRUE ANSWER : ? YOUR ANSWER : ?
In order that linear programming techniques provide valid results Relations between factors must be linear (positive) Only one factor should change at a time, others remaining constant Relations between factors must be linear (negative) Either (A) or (B) TRUE ANSWER : ? YOUR ANSWER : ?
Two alternatives can produce a product. First have a fixed cost of Rs. 2000 and a variable cost of Rs. 20 per piece. The second method has a fixed cost of Rs. 1500 and a variable cost of Rs. 30. The break even quantity between the two alternatives is 100 25 75 50 TRUE ANSWER : ? YOUR ANSWER : ?
Critical path on PERT/CPM chart is obtained by joining the events having Maximum slack Average slack Minimum slack No slack TRUE ANSWER : ? YOUR ANSWER : ?
The routing function in a production system design is concerned with Optimizing material flow through the plant Manpower utilization Machine utilization Quality assurance of the product TRUE ANSWER : ? YOUR ANSWER : ?