The capacitance of an overhead transmission line increases with neither 1 nor 2 increase in mutual geometrical mean distance both 1 and 2 increase in height of conductors above ground TRUE ANSWER : ? YOUR ANSWER : ?
Which of the following power plants can generate power at unpredictable or uncontrollable time Wind turbine. Pulverising unit. Condenser. Cooling tower. TRUE ANSWER : ? YOUR ANSWER : ?
Deaerative heating is done to remove dissolved. heat the steam. heat the feed water. remove dissolved gases in water. TRUE ANSWER : ? YOUR ANSWER : ?
A coal fired steam power station working at a plant factor of 80% has one 500 MW generating unit. If the heat content of coal is 2 kWh/kg, the overall plant efficiency is 40% and a train load of coal is 2000 metric tons, then the number of trains required daily for the plant is 6 10 16 2 TRUE ANSWER : ? YOUR ANSWER : ?
Which of the following statements is/are true? Due to corona, All of these charging current increases interference increases power loss increases TRUE ANSWER : ? YOUR ANSWER : ?
Isolator in sub station is open under ------------- condition? no load short circuit any of the above full load TRUE ANSWER : ? YOUR ANSWER : ?
Out of the following plant categories which is not the base load power plant? Pump storage. Run of river. Nuclear. Diesel. TRUE ANSWER : ? YOUR ANSWER : ?
An ACSR conductor has a diameter of 2 cm has internal inductance of 0.05 mH/Km. If this ACSR is replaced with another having a diameter of 4 cm then its internal inductance is 0.025 mH/Km 0.1 mH/Km 0.05 mH/Km 0 mH/Km TRUE ANSWER : ? YOUR ANSWER : ?
Taking the density of water to be 1000 kg/m³, how much power would be developed by a hydro electric generator unit, assume 100% efficiency, with 1 m head and 1 m³/s discharge? 19.60 kW 2.90 kW 9.81 kW 4.45 kW TRUE ANSWER : ? YOUR ANSWER : ?
The sequence components of the fault current are as follows: IR1 = j1.5 pu, IR2 = -j0.5 pu, IR0 = -j1. The type of fault is LLL LLG LL LG TRUE ANSWER : ? YOUR ANSWER : ?