The expected out turn of cement concrete 1 : 2 : 4 per mason per day is 1.5 m³ 5.0 m³ 2.5 m³ 3.5 m³ TRUE ANSWER : ? YOUR ANSWER : ?
If tensile stress of a steel rod of diameter ‘D’ is 1400 kg/cm² and bond stress is 6 kg/cm², the required bond length of the rod is 39 D 50 D 30 D 59 D TRUE ANSWER : ? YOUR ANSWER : ?
The brick work is not measured in cu m in case of Reinforced brick work Brick work in arches One or more than one brick wall Half brick wall TRUE ANSWER : ? YOUR ANSWER : ?
For 12 mm thick cement plastering 1 : 6 on 100 sq.m new brick work, the quantity of cement required, is 0.200 m³ 0.247 m³ 0.295 m³ 0.274 m³ TRUE ANSWER : ? YOUR ANSWER : ?
Pick up the correct statement in case of water supply. Pipes laid in trenches and pipes fixed to walls are measured separately Pipes are classified according to their sizes and quality Cutting through walls and floors are included with the item All of these TRUE ANSWER : ? YOUR ANSWER : ?
The order of booking dimensions is Breadth, length, height Length, breadth, height Height, breadth, length None of these TRUE ANSWER : ? YOUR ANSWER : ?
In case of laying gullies, siphons, intercepting traps, the cost includes All of these Bed concreting Setting and laying Connection to drains TRUE ANSWER : ? YOUR ANSWER : ?
The rate of payment is made for 100 cu m (per % cu m) in case of All of these Rock cutting Earth work in excavation Excavation in trenches for foundation TRUE ANSWER : ? YOUR ANSWER : ?
Due to change in price level, a revised estimate is prepared if the sanctioned estimate exceeds 0.02 0.04 0.05 0.025 TRUE ANSWER : ? YOUR ANSWER : ?
The expected out turn for earth work in excavation in ordinary soil per workman per day is 1.00 cum 4.00 cum 3.00 cum 2.00 cum TRUE ANSWER : ? YOUR ANSWER : ?