Size, capacity and materials need be specified for Bib-cocks All of these Stop-cocks Ball valves TRUE ANSWER : ? YOUR ANSWER : ?
The expected out turn of 2.5 cm cement concrete floor per mansion per day 5.0 sqm 2.5 sqm 10 sqm 7.5 sqm TRUE ANSWER : ? YOUR ANSWER : ?
Referring of given figure, pick up the correct statement from the following: Length of short walls in-to-in is 3.20 m All listed here Length of long wall out-to-out is 6.80 m The total length of centre line of four walls is 20 m TRUE ANSWER : ? YOUR ANSWER : ?
The measurement is made in square metre in case of R.C.C. structure Hollow concrete block wall Cement concrete in foundation None of these TRUE ANSWER : ? YOUR ANSWER : ?
The volume is measured correct to the nearest 0.02 cum 0.04 cum 0.01 cum 0.03 cum TRUE ANSWER : ? YOUR ANSWER : ?
The concrete work for the following part of the building of specified thickness is measured in square meters Root slabs All of these Floors Wall panels TRUE ANSWER : ? YOUR ANSWER : ?
The following item of earth work is not measured separately. Site clearance Setting out of works All listed here Steps in deep excavation TRUE ANSWER : ? YOUR ANSWER : ?
Pick up the item of work not included in the plinth area estimate Wall thickness W' Area Room area Courtyard area TRUE ANSWER : ? YOUR ANSWER : ?
In case of laying gullies, siphons, intercepting traps, the cost includes Connection to drains All of these Setting and laying Bed concreting TRUE ANSWER : ? YOUR ANSWER : ?
The 'centre line method' is specially adopted for estimating Hexagonal buildings All of these Octagonal buildings Circular buildings TRUE ANSWER : ? YOUR ANSWER : ?