The expected out turn for earth work in excavation in ordinary soil per workman per day is 3.00 cum 2.00 cum 1.00 cum 4.00 cum TRUE ANSWER : ? YOUR ANSWER : ?
The item of steel work which is measured in sq.m, is Collapsible gates Ventilators and glazing Rolling shutters All listed here TRUE ANSWER : ? YOUR ANSWER : ?
The plinth area of a building not includes Lift and wall including landing Internal shaft for sanitary installations up to 2 sq m. in area Area of cantilevered porch Area of the walls at the floor level TRUE ANSWER : ? YOUR ANSWER : ?
The correct Prismoidal formula for volume is D/6 [first area + last area + 2 ∑ Even area + 4 ∑ odd areas] D/3 [first area + last area + 2 Ʃ Even area + 4 Ʃ odd areas] D/3 [first area + last area + 4 Ʃ Even area + 2 Ʃ odd areas] D [first area + last area + Ʃ Even area + 2 Ʃ odd areas] TRUE ANSWER : ? YOUR ANSWER : ?
Pick up the correct statement in case of water supply. All of these Cutting through walls and floors are included with the item Pipes are classified according to their sizes and quality Pipes laid in trenches and pipes fixed to walls are measured separately TRUE ANSWER : ? YOUR ANSWER : ?
Due to change in price level, a revised estimate is prepared if the sanctioned estimate exceeds 0.05 0.025 0.02 0.04 TRUE ANSWER : ? YOUR ANSWER : ?
The weight of an item is measured correct to nearest 0.75 kg 0.25 kg 0.50 kg 1.00 kg TRUE ANSWER : ? YOUR ANSWER : ?
Pick up the item of work not included in the plinth area estimate W' Area Room area Wall thickness Courtyard area TRUE ANSWER : ? YOUR ANSWER : ?
The 'centre line method' is specially adopted for estimating Octagonal buildings All of these Circular buildings Hexagonal buildings TRUE ANSWER : ? YOUR ANSWER : ?
The rate of an item of work depends on All of these Proportion of mortar Specifications of materials Specifications of works TRUE ANSWER : ? YOUR ANSWER : ?