In India production and distribution of electrical energy is confined to joint sector government sectors private sector None of these public sector TRUE ANSWER : ? YOUR ANSWER : ?
The smaller the lagging reactive power drawn by the circuit None of the listed here The higher is the p. f. The smaller is the p. f The higher is the active power TRUE ANSWER : ? YOUR ANSWER : ?
Which of the following, in a thermal power plant, is not a fixed cost? Depreciation Insurance charges Fuel cost Interest on capital TRUE ANSWER : ? YOUR ANSWER : ?
A consumer has to pay lesser fixed charges in flat rate tariff two part tariff any of the above maximum demand tariff TRUE ANSWER : ? YOUR ANSWER : ?
Approximate estimation of power demand can be made by Statistical methods All of the listed here Mathematical method Load survey method TRUE ANSWER : ? YOUR ANSWER : ?
Most fundamental method for calculating the depreciation of equipment is Sinking fund method Straight line method None of the listed here Diminishing value method TRUE ANSWER : ? YOUR ANSWER : ?
In Hopknison demand rate or two parttariff the demand rate or fixed charges are neither (A) nor (B) dependent upon the maximum demand of the consumer dependent upon the energy consumed both (A) and (B) TRUE ANSWER : ? YOUR ANSWER : ?
When the power factor is improved, the lagging kVAR drawn from the supply will Remains same Decreases None of the listed here Increase TRUE ANSWER : ? YOUR ANSWER : ?
For a consumer most economical power factor is generally 0.5 lagging 0.95 leading 0.5 leading 0.95 lagging TRUE ANSWER : ? YOUR ANSWER : ?