Data manipulation language (DML) specifies for the DBMS what is required; the techniques used to process data determine how data must be structured to produce the user's view describes how data are structured in the data base all of the listed here TRUE ANSWER : ? YOUR ANSWER : ?
Coding and testing are done In a ad hoc manner bottom-up manner top-down manner cross sectional manner None of these TRUE ANSWER : ? YOUR ANSWER : ?
A feasibility document should contain all of the following except: problem descriptions project name data-flow diagrams feasible alternative TRUE ANSWER : ? YOUR ANSWER : ?
Acceptance testing is running the system with line data by the actual user testing changes made in an existing or a new program is checking the logic of one or more programs in the candidate systems making sure that the new programs do in fact process certain transactions according to Specifications TRUE ANSWER : ? YOUR ANSWER : ?
After planning an algorithm, you should _____ to verify that it will work correctly. Code the algorithm Analyze the algorithm None of these Evaluate and modify (if necessary) the program. Desk-check the algorithm TRUE ANSWER : ? YOUR ANSWER : ?
During what phase, the requirement analysis is performed? None of these system design phase system development phase system investigation phase system analysis phase TRUE ANSWER : ? YOUR ANSWER : ?
Which of the following systems implementation approaches should be used if you want to run the old system and the new system at the same time for a specified period? parallel pilot phased direct TRUE ANSWER : ? YOUR ANSWER : ?
A feasibility study includes a statement of the problems a list of alternative solution considered None of these both (a) and (b) considers a single solutions TRUE ANSWER : ? YOUR ANSWER : ?
The approach used in top-down analysis and design is to identify a top level function an d then create a hierarchy of lower-level modules and components. to prepare flow charts after programming has been completed all of the listed here to identify the top level functions by combining many smaller components into a single entity TRUE ANSWER : ? YOUR ANSWER : ?
On the feasibility committee, department representatives serve as: all of the listed here ready sources of information liaison to their departments direct users of the new system TRUE ANSWER : ? YOUR ANSWER : ?