The floor area includes the area of the balcony up to 1 0.5 0.75 0.25 TRUE ANSWER : ? YOUR ANSWER : ?
The 'centre line method' is specially adopted for estimating Hexagonal buildings Octagonal buildings Circular buildings All of these TRUE ANSWER : ? YOUR ANSWER : ?
The brick work is measured in sq metre, in case of Brick flat soling Half brick walls or the partition All of these Honey comb brick work TRUE ANSWER : ? YOUR ANSWER : ?
The inspection pit or chamber is a manhole provided in a base drainage system At every 30 m intervals At every change of direction All of these At every change of gradient TRUE ANSWER : ? YOUR ANSWER : ?
The diameter of a domestic sewer pipe laid at gradient 1 in 100 is recommended 150 mm 200 mm 100 mm 175 mm TRUE ANSWER : ? YOUR ANSWER : ?
For 12 mm thick cement plastering 1 : 6 on 100 sq.m new brick work, the quantity of cement required, is 0.295 m³ 0.274 m³ 0.200 m³ 0.247 m³ TRUE ANSWER : ? YOUR ANSWER : ?
According to ISI method of measurement, the order of the sequence is Breadth, length, height Height, length, breadth Length, breadth, height None of these TRUE ANSWER : ? YOUR ANSWER : ?
If B is the width of formation, d is the height of the embankment, side slope S : 1, for a highway with no transverse slope, the area of cross-section is B × d - Sd1/2 Bd + Sd2 B + d + Sd ½ (Bd + Sd2) TRUE ANSWER : ? YOUR ANSWER : ?
The total length of a cranked bar through a distance (d) at 45° in case of a beam of effective length L, is L - (2 × 0.4 d) L - (0.42 d) L + (2 × 0.42 d) L + 0.42 d TRUE ANSWER : ? YOUR ANSWER : ?
In case of laying gullies, siphons, intercepting traps, the cost includes Bed concreting Setting and laying All of these Connection to drains TRUE ANSWER : ? YOUR ANSWER : ?