Industrial Engineering and Production Management Job enrichment technique is applied to Make people happy Reduce labour monotony Overcome boring and demotivating work All of the listed here Make people happy Reduce labour monotony Overcome boring and demotivating work All of the listed here ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management In inventory control, the economic order quantity is the Highest level of inventory Optimum lot size Capability of a plant to produce Lot corresponding to break-even point Highest level of inventory Optimum lot size Capability of a plant to produce Lot corresponding to break-even point ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management If (R) is the base rate guaranteed per hour, (S) is the standard time for the job and (T) is the actual time, then according to Rowan plan, wages for the job will be TR TR + [(S - T)/S] × R TR + (S - T) × R TR + [(S - T)/2] × R TR TR + [(S - T)/S] × R TR + (S - T) × R TR + [(S - T)/2] × R ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management In crash program for a project both direct and indirect costs, increase cost is no criterion indirect costs increase and direct costs decrease direct costs increase and indirect costs decrease both direct and indirect costs, increase cost is no criterion indirect costs increase and direct costs decrease direct costs increase and indirect costs decrease ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management Emergency rush order can be pushed more effectively in Continuous production Intermittent production Automatic production Job production Continuous production Intermittent production Automatic production Job production ANSWER DOWNLOAD EXAMIANS APP