Industrial Engineering and Production Management Pick up the correct statement about relationship between various floats Independent float = total float Independent float > free float Independent float < free float Free float = total float Independent float = total float Independent float > free float Independent float < free float Free float = total float ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management Which of the following conditions are necessary for applying linear programming? All of these The resources must be in limited supply. These must be a well defined objective function. The decision variables should be interrelated and nonnegative. All of these The resources must be in limited supply. These must be a well defined objective function. The decision variables should be interrelated and nonnegative. ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management If (R) is the base rate guaranteed per hour, (S) is the standard time for the job and (T) is the actual time, then according to Halsey 50-50 plan, wages for the job will be TR + [(S - T)/S] × R TR TR + [(S - T)/2] × R TR + (S - T) × R TR + [(S - T)/S] × R TR TR + [(S - T)/2] × R TR + (S - T) × R ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management P.M.T.S. (Predetermined Motion Time Systems) include M.T.M. (Method Time Measurement) W.F.S. (Work Factor Systems) All of these M.T.S. (Basic Motion Time Study) M.T.M. (Method Time Measurement) W.F.S. (Work Factor Systems) All of these M.T.S. (Basic Motion Time Study) ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management Which of the following statement is correct about the network diagram? The events are represented graphically by circles or nodes at the beginning and the end of activity by arrows. The tail end of the arrow represents the start of an activity. The head of the arrow represents the end of an activity. All of the these The events are represented graphically by circles or nodes at the beginning and the end of activity by arrows. The tail end of the arrow represents the start of an activity. The head of the arrow represents the end of an activity. All of the these ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management In a PERT chart Only important activities should be numbered Only critical activities are numbered All activities should be numbered Only selected activities are numbered Only important activities should be numbered Only critical activities are numbered All activities should be numbered Only selected activities are numbered ANSWER DOWNLOAD EXAMIANS APP