Process Control and Instrumentation Pick out the first order system from among the following. Mercury in glass thermometer kept in boiling water Interacting system of two tanks in series Damped vibrator Non-interacting system of two tanks in series Mercury in glass thermometer kept in boiling water Interacting system of two tanks in series Damped vibrator Non-interacting system of two tanks in series ANSWER DOWNLOAD EXAMIANS APP
Process Control and Instrumentation Sub-zero temperature (< 0°C) can be measured by a constant volume gas thermometer employing Hydrogen Nitrogen None of these Helium Hydrogen Nitrogen None of these Helium ANSWER DOWNLOAD EXAMIANS APP
Process Control and Instrumentation Liquid discharge from a tank or reservoir can not be measured by Notches Mouthpieces Orificemeters Weirs Notches Mouthpieces Orificemeters Weirs ANSWER DOWNLOAD EXAMIANS APP
Process Control and Instrumentation Typical specifications for design stipulates the gain margin and phase margin to be respectively < 1.7 and < 30° > 1.7 and > 30° > 1.7 and < 30° < 1.7 and > 30° < 1.7 and < 30° > 1.7 and > 30° > 1.7 and < 30° < 1.7 and > 30° ANSWER DOWNLOAD EXAMIANS APP
Process Control and Instrumentation The time constant of a first order process with resistance R and capacitance C is R - C 1/RC RC R + C R - C 1/RC RC R + C ANSWER DOWNLOAD EXAMIANS APP
Process Control and Instrumentation Time constant is the Time taken by the controlled variable to reach 63.2% of its full change Time required by the measured variable to reach 63.2% of its ultimate change Same as transportation lag Same as dead time Time taken by the controlled variable to reach 63.2% of its full change Time required by the measured variable to reach 63.2% of its ultimate change Same as transportation lag Same as dead time ANSWER DOWNLOAD EXAMIANS APP