Period of cleaning of slow sand filters is about

2 - 3 months
1 - 2 year
24 - 48 hours
10 - 12 days

ANSWER DOWNLOAD EXAMIANS APP

Environmental Engineering
The correct relation between theoretical oxygen demand (TOD), Biochemical oxygen demand (BOD) and Chemical oxygen demand (COD) is given by

BOD > COD > TOD
COD > BOD > TOD
TOD > COD > BOD
TOD > BOD > COD

ANSWER DOWNLOAD EXAMIANS APP

Environmental Engineering
As compared to geometrical increase method of forecasting population, arithmetical increase method gives

Same value
Accurate value
Lesser value
Higher value

ANSWER DOWNLOAD EXAMIANS APP

Environmental Engineering
Chlorine demand of water is equal to

Sum of applied and residual chlorine
Residual chlorine
Difference of applied and residual chlorine
Applied chlorine

ANSWER DOWNLOAD EXAMIANS APP

Environmental Engineering
The settling velocity of a particle in a sedimentation tank depends on

None of these
Surface area of tank
Both depth and surface area of tank
Depth of tank

ANSWER DOWNLOAD EXAMIANS APP

Environmental Engineering
The depression of water table in a well due to pumping will be maximum(Where ‘R’ is the radius of influence)

Close to the well
At a distance R from the well
None of these
At a distance R/2 from the well

ANSWER DOWNLOAD EXAMIANS APP
MORE MCQ ON Environmental Engineering

DOWNLOAD APP

  • APPLE
    from app store
  • ANDROID
    from play store

SEARCH

LOGIN HERE


  • GOOGLE

FIND US

  • 1.70K
    FOLLOW US
  • EXAMIANSSTUDY FOR YOUR DREAMS.
  • SUPPORT :SUPPORT EMAIL ACCOUNT : examians@yahoo.com

OTHER WEBSITES

  • GUJARATI MCQ
  • ACCOUNTIANS

QUICK LINKS

  • HOME
  • QUIZ
  • PRIVACY POLICY
  • DISCLAIMER
  • TERMS & CONDITIONS
  • CONTACT US
↑