Environmental Engineering Period of cleaning of slow sand filters is about 10 - 12 days 2 - 3 months 1 - 2 year 24 - 48 hours 10 - 12 days 2 - 3 months 1 - 2 year 24 - 48 hours ANSWER DOWNLOAD EXAMIANS APP
Environmental Engineering The process in which the chlorination is done beyond the break point is known as Pre-chlorination Super chlorination Post chlorination Break point chlorination Pre-chlorination Super chlorination Post chlorination Break point chlorination ANSWER DOWNLOAD EXAMIANS APP
Environmental Engineering The main disadvantage of oxidation pond is that Maintenance and operation cost are high None of these BOD removal is very low Large area is required for construction Maintenance and operation cost are high None of these BOD removal is very low Large area is required for construction ANSWER DOWNLOAD EXAMIANS APP
Environmental Engineering The minimum dissolved oxygen which should always be present in water in order to save the aquatic life is 10 ppm 1 ppm 4 ppm 40 ppm 10 ppm 1 ppm 4 ppm 40 ppm ANSWER DOWNLOAD EXAMIANS APP
Environmental Engineering The process of lagooning is primarily a means of Increasing flow of sewage through imhoff tanks Reducing the excessive flow in sewers Disposing of sludge Increasing the capacity of storage reservoirs Increasing flow of sewage through imhoff tanks Reducing the excessive flow in sewers Disposing of sludge Increasing the capacity of storage reservoirs ANSWER DOWNLOAD EXAMIANS APP
Environmental Engineering The amount of coagulant needed for coagulation of water increases with (i) Increase in turbidity of water (ii) Decrease in turbidity of water (iii) Increase in temperature of water (iv) Decrease in temperature of water The correct answer is (i)and(iv) (ii) and (iv) (i) and (ii) (ii) and (iii) (i)and(iv) (ii) and (iv) (i) and (ii) (ii) and (iii) ANSWER DOWNLOAD EXAMIANS APP