Environmental Engineering Period of cleaning of slow sand filters is about 1 - 2 year 24 - 48 hours 10 - 12 days 2 - 3 months 1 - 2 year 24 - 48 hours 10 - 12 days 2 - 3 months ANSWER DOWNLOAD EXAMIANS APP
Environmental Engineering Ground water is usually free from None of these Both suspended and dissolved impurities Dissolved impurities Suspended impurities None of these Both suspended and dissolved impurities Dissolved impurities Suspended impurities ANSWER DOWNLOAD EXAMIANS APP
Environmental Engineering Standard BOD is measured at 20°C - 1 day 25°C - 3 day 30°C - 5 day 20°C - 5 day 20°C - 1 day 25°C - 3 day 30°C - 5 day 20°C - 5 day ANSWER DOWNLOAD EXAMIANS APP
Environmental Engineering The effect of increasing diameter of sewer on the self cleansing velocity is To increase it To decrease it Fluctuating Nil To increase it To decrease it Fluctuating Nil ANSWER DOWNLOAD EXAMIANS APP
Environmental Engineering Hardy cross method of analysis of distribution system (i) Involves successive trials (ii) Takes economic aspects into account (iii) Is time consuming (i) and (ii) Only (i) (i) and (iii) All are correct (i) and (ii) Only (i) (i) and (iii) All are correct ANSWER DOWNLOAD EXAMIANS APP
Environmental Engineering The gas from sludge digestion tank is mainly composed of Nitrogen Carbon dioxide Hydrogen sulphide Methane Nitrogen Carbon dioxide Hydrogen sulphide Methane ANSWER DOWNLOAD EXAMIANS APP