Power Systems Load frequency control is achieved by properly matching the individual machines generated voltages. reactive powers. turbine inputs. generator ratings. generated voltages. reactive powers. turbine inputs. generator ratings. ANSWER DOWNLOAD EXAMIANS APP
Power Systems If the percentage reactance of an element is 20 % and the full load current is 50 Amp, the short circuit current will be 350 Amp. 300 Amp. 200 Amp. 250 Amp. 350 Amp. 300 Amp. 200 Amp. 250 Amp. ANSWER DOWNLOAD EXAMIANS APP
Power Systems Gross head of an hydroelectric power station is the difference of water level between the level in storage and tail race. the height of water level in the river where the tail race is provided. all of above. the height of water level in the river where the storage is provided. the difference of water level between the level in storage and tail race. the height of water level in the river where the tail race is provided. all of above. the height of water level in the river where the storage is provided. ANSWER DOWNLOAD EXAMIANS APP
Power Systems A hydroelectric power station is commonly found in desert areas. swamps. hilly areas. grasslands. desert areas. swamps. hilly areas. grasslands. ANSWER DOWNLOAD EXAMIANS APP
Power Systems On what factors does the selection of a water turbine depend Speed. Working head. Nature of load. All of above. Speed. Working head. Nature of load. All of above. ANSWER DOWNLOAD EXAMIANS APP
Power Systems Counter poise is used for reduce losses more surge impedance proper discharging of lighting surges less surge impedance reduce losses more surge impedance proper discharging of lighting surges less surge impedance ANSWER DOWNLOAD EXAMIANS APP