Industrial Engineering and Production Management Merit rating is the method of determining the Workers performance on a job Relative values of a job Worth of a machine Value of overall production Workers performance on a job Relative values of a job Worth of a machine Value of overall production ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management Which of the following is independent of sales forecast? Productivity Inventory control Production planning Production control Productivity Inventory control Production planning Production control ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management In the Emerson efficiency plan, a worker receives only his daily wage and no bonus is paid till his efficiency reaches 0.75 0.8 0.5 0.6667 0.75 0.8 0.5 0.6667 ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management String diagram is used All of these Where processes require the operator to be moved from one place to another When a group of workers are working at a place For checking the relative values of various layouts All of these Where processes require the operator to be moved from one place to another When a group of workers are working at a place For checking the relative values of various layouts ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management In micro-motion study, therblig is described by An event A symbol Standard symbol and colour An activity An event A symbol Standard symbol and colour An activity ANSWER DOWNLOAD EXAMIANS APP