Industrial Engineering and Production Management Merit rating is the method of determining the Workers performance on a job Worth of a machine Relative values of a job Value of overall production Workers performance on a job Worth of a machine Relative values of a job Value of overall production ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management Which of the following is independent of sales forecast? Production planning Inventory control Production control Productivity Production planning Inventory control Production control Productivity ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management In the Emerson efficiency plan, a worker receives only his daily wage and no bonus is paid till his efficiency reaches 0.6667 0.75 0.8 0.5 0.6667 0.75 0.8 0.5 ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management String diagram is used All of these When a group of workers are working at a place For checking the relative values of various layouts Where processes require the operator to be moved from one place to another All of these When a group of workers are working at a place For checking the relative values of various layouts Where processes require the operator to be moved from one place to another ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management In micro-motion study, therblig is described by An event Standard symbol and colour A symbol An activity An event Standard symbol and colour A symbol An activity ANSWER DOWNLOAD EXAMIANS APP