Industrial Engineering and Production Management Merit rating is the method of determining the Value of overall production Relative values of a job Workers performance on a job Worth of a machine Value of overall production Relative values of a job Workers performance on a job Worth of a machine ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management Which of the following is independent of sales forecast? Productivity Production planning Production control Inventory control Productivity Production planning Production control Inventory control ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management In the Emerson efficiency plan, a worker receives only his daily wage and no bonus is paid till his efficiency reaches 0.8 0.6667 0.75 0.5 0.8 0.6667 0.75 0.5 ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management String diagram is used All of these When a group of workers are working at a place Where processes require the operator to be moved from one place to another For checking the relative values of various layouts All of these When a group of workers are working at a place Where processes require the operator to be moved from one place to another For checking the relative values of various layouts ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management In micro-motion study, therblig is described by Standard symbol and colour An event An activity A symbol Standard symbol and colour An event An activity A symbol ANSWER DOWNLOAD EXAMIANS APP