Industrial Engineering and Production Management Merit rating is the method of determining the Worth of a machine Workers performance on a job Value of overall production Relative values of a job Worth of a machine Workers performance on a job Value of overall production Relative values of a job ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management Which of the following is independent of sales forecast? Productivity Inventory control Production control Production planning Productivity Inventory control Production control Production planning ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management In the Emerson efficiency plan, a worker receives only his daily wage and no bonus is paid till his efficiency reaches 0.75 0.6667 0.8 0.5 0.75 0.6667 0.8 0.5 ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management String diagram is used All of these When a group of workers are working at a place Where processes require the operator to be moved from one place to another For checking the relative values of various layouts All of these When a group of workers are working at a place Where processes require the operator to be moved from one place to another For checking the relative values of various layouts ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management In micro-motion study, therblig is described by An event Standard symbol and colour A symbol An activity An event Standard symbol and colour A symbol An activity ANSWER DOWNLOAD EXAMIANS APP