Control Systems In which of the following controller band width is increased? proportional plus derivative controller nether 1 nor 2 both 1 and 2 proportional plus integral controller proportional plus derivative controller nether 1 nor 2 both 1 and 2 proportional plus integral controller ANSWER DOWNLOAD EXAMIANS APP
Control Systems Time taken by the response to reach and stay within a specified error is called Peak time. Peak overshoot. Raise time. Settling time. Peak time. Peak overshoot. Raise time. Settling time. ANSWER DOWNLOAD EXAMIANS APP
Control Systems The angle condition used for checking whether any point lies on root locus or not is........... ± (2q + 1) 360o. ± (2q) 360o. ± (2q) 180o. ± (2q + 1) 180o. ± (2q + 1) 360o. ± (2q) 360o. ± (2q) 180o. ± (2q + 1) 180o. ANSWER DOWNLOAD EXAMIANS APP
Control Systems If the bandwidth of the system is very large, the system response is slower independent of bandwidth faster None of these slower independent of bandwidth faster None of these ANSWER DOWNLOAD EXAMIANS APP
Control Systems The transfer function of the control system depends on nature of the output. initial conditions of input and output. the system parameters alone. nature of the input. nature of the output. initial conditions of input and output. the system parameters alone. nature of the input. ANSWER DOWNLOAD EXAMIANS APP
Control Systems The closed loop transfer function of a unity feedback control system is 9/(s² + 3s + 9), then the type of the system is 3 1 2 0 3 1 2 0 ANSWER DOWNLOAD EXAMIANS APP