Building Maintenance In which beam tension capacity of steel is greater than combined compression capacity of steel and concrete? Over-reinforced Singly reinforced Under-reinforced Doubly reinforced Over-reinforced Singly reinforced Under-reinforced Doubly reinforced ANSWER DOWNLOAD EXAMIANS APP
Building Maintenance The slope of a ramp should not be more than: 1 in 35 1 in 20 1 in 15 1 in 10 1 in 35 1 in 20 1 in 15 1 in 10 ANSWER DOWNLOAD EXAMIANS APP
Building Maintenance Leaks in the pitched roof may be caused due to: Improper slopes Depression on top of roof Unfinished roof and wall junction Heavy wind Improper slopes Depression on top of roof Unfinished roof and wall junction Heavy wind ANSWER DOWNLOAD EXAMIANS APP
Building Maintenance Which type of inspection is more intensive involving examination of structural elements? General inspection Minor inspection Major inspection Reverse inspection General inspection Minor inspection Major inspection Reverse inspection ANSWER DOWNLOAD EXAMIANS APP
Building Maintenance The crack propagation in the concrete girders can be arrested by using the principles of ____________ Prestressing Post tensioning Loading Pre tensioning Prestressing Post tensioning Loading Pre tensioning ANSWER DOWNLOAD EXAMIANS APP
Building Maintenance In prestressed concrete structures the primary problem is damaged caused to ____________ Anchorages Ridges Bridge decks Spans Anchorages Ridges Bridge decks Spans ANSWER DOWNLOAD EXAMIANS APP