Waste Water Engineering In a city the ratio of the drainage to sewage is 20, the percentage discharge passing through non-monsoon periods, is 20 15 10 5 20 15 10 5 ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The spacing of bars for perforations in coarse screens used for the treatment of sewage, is 40 mm 50 mm 20 mm 30 mm 40 mm 50 mm 20 mm 30 mm ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering 5 days-biochemical oxygen demand (BOD5) is taken at a temperature of 15°C 0°C 20°C 25°C 15°C 0°C 20°C 25°C ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering Chlorination of water is done for the removal of Suspended solids Bacterias Hardness Sediments Suspended solids Bacterias Hardness Sediments ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering In detritus tanks, Detention period is kept 3 to 4 minutes All listed here Flow velocity is kept 0.09 m/sec Organic and inorganic materials are separated Detention period is kept 3 to 4 minutes All listed here Flow velocity is kept 0.09 m/sec Organic and inorganic materials are separated ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering In case of Imhoff tanks, Detention period is 2 hours All of these The shape is rectangular The velocity of flow is restricted to 0.30 m/minute Detention period is 2 hours All of these The shape is rectangular The velocity of flow is restricted to 0.30 m/minute ANSWER DOWNLOAD EXAMIANS APP