Waste Water Engineering In a city the ratio of the drainage to sewage is 20, the percentage discharge passing through non-monsoon periods, is 10 5 15 20 10 5 15 20 ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering In a fully mechanised composting plant, involves Mechanized pulverising of refuse All of these Mechanized segregation Mechanized receipt Mechanized pulverising of refuse All of these Mechanized segregation Mechanized receipt ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering In a grit chamber of a sewage treatment plant, One minute of detention period is kept Flow velocity 0.15 m to 0.3 m/sec is kept All of these Depth of 0.9 m to 1.20 m is kept One minute of detention period is kept Flow velocity 0.15 m to 0.3 m/sec is kept All of these Depth of 0.9 m to 1.20 m is kept ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering Water content of sewage is about 0.99 0.9 0.95 0.999 0.99 0.9 0.95 0.999 ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The moisture content of sludge is reduced from 90% to 80% in a sludge digestion tank. The percentage decrease in the volume of sludge, is 0.25 0.05 0.5 0.1 0.25 0.05 0.5 0.1 ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The minimum recommended diameter of sewers, is 10 cm 20 cm 5 cm 15 cm 10 cm 20 cm 5 cm 15 cm ANSWER DOWNLOAD EXAMIANS APP