GETCO Exam Paper (11-06-2017) In a 3-phase supply, floating neutral is undesirable because it may result in _____ across the load unequal line voltage none low voltage high voltage unequal line voltage none low voltage high voltage ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (11-06-2017) A power system needs injection of VARs at peak load both peak and off-peak load full load off-peak load peak load both peak and off-peak load full load off-peak load ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (11-06-2017) For an overhead line, the surge impedance is taken as 100-200 Ω 500-1000 Ω 70-80 Ω 20-40 Ω 100-200 Ω 500-1000 Ω 70-80 Ω 20-40 Ω ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (11-06-2017) The most common type of fault is phase-to-phase single phase to ground two phase to ground three phase to ground phase-to-phase single phase to ground two phase to ground three phase to ground ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (11-06-2017) Who is the Revenue Minister of Gujarat State? (as on 06/10/2017) Nitinbhai Patel Ganpatbhai Vasava Vijaybhai Rupani Bhupendrasinh Chudasma Nitinbhai Patel Ganpatbhai Vasava Vijaybhai Rupani Bhupendrasinh Chudasma ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (11-06-2017) In hydropower station what is an enlarge body of water just above the intake and used as a regulating reservoir, called Reservoir Forebay Spilways Penstock Reservoir Forebay Spilways Penstock ANSWER DOWNLOAD EXAMIANS APP