GETCO Exam Paper (11-06-2017) The most accurate and versatile method of achieving power compensation is by using switched capacitor with controlled reactors saturable reactor with capacitor bank switched capacitors fixed capacitor with controlled reactor switched capacitor with controlled reactors saturable reactor with capacitor bank switched capacitors fixed capacitor with controlled reactor ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (11-06-2017) In thermal power plants, the pressure in the working fluid cycle is developed by feed water pump condenser superheater turbine feed water pump condenser superheater turbine ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (11-06-2017) Which Article of the constitution provides freedom to manage religious affairs? Article 27 Article 26 Article 25 Article 28 Article 27 Article 26 Article 25 Article 28 ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (11-06-2017) The main function of economiser of a boiler plant is to reduce fuel consumption increase steam pressure increase life of the boiler increases steam production reduce fuel consumption increase steam pressure increase life of the boiler increases steam production ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (11-06-2017) Give synonym: Cancel Approve Allow Abolish Break Approve Allow Abolish Break ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (11-06-2017) The World Milk Day (WMD) is observed on which date? 3rd June 5th June 4th June 1st June 3rd June 5th June 4th June 1st June ANSWER DOWNLOAD EXAMIANS APP