If the velocity of wind is doubled then the power output will

reduced to half
increase by 6 times
doubled
increase by 8 times

ANSWER EXPLANATION DOWNLOAD EXAMIANS APP

MGVCL Exam Paper (30-07-2021 Shift 3)
Which of the following statements are correct?
(i) Advanced metering infrastructure (AMI) is typically more automated and allows real- time, on-demand interrogations with metering endpoints.
(ii) An Automated Meter Reading (AMR) device only communicates from the customer to the energy supplier.
(iii) AMR meters only provide kWh information and possible peak kW demand for the month.

(ii) and (iii) only
(i), (ii) and (iii)
(i) and (iii) only
(i) and (ii) only