Power Systems If the rated receiving end voltage is 33 kV, then what are the limits for safe operation of equipments? any voltage above 33 kV 31.35 to 34.65 kV 33 to 50 kV 25 to 35 kV any voltage above 33 kV 31.35 to 34.65 kV 33 to 50 kV 25 to 35 kV ANSWER DOWNLOAD EXAMIANS APP
Power Systems The power output from an hydroelectric plants depend on discharge, system efficiency. type of dam, type of catchment area and discharge. type of dam, head, system efficiency. type of turbine, type of dam and type of catchment area. discharge, system efficiency. type of dam, type of catchment area and discharge. type of dam, head, system efficiency. type of turbine, type of dam and type of catchment area. ANSWER DOWNLOAD EXAMIANS APP
Power Systems The per unit impedance Z(pu) is given by ZΩ* (MVA)b/(KV)²b ZΩ* (kVA)b/(KV)²b ZΩ* (MVA)b/((KV)²b *100) ZΩ* (MVA)b*100/(KV)²b ZΩ* (MVA)b/(KV)²b ZΩ* (kVA)b/(KV)²b ZΩ* (MVA)b/((KV)²b *100) ZΩ* (MVA)b*100/(KV)²b ANSWER DOWNLOAD EXAMIANS APP
Power Systems A thermal protection relay provides protection against what? any of the above Temperature Over load Short circuit any of the above Temperature Over load Short circuit ANSWER DOWNLOAD EXAMIANS APP
Power Systems The positive (Z1), negative (Z2) and zero sequence (Z0) impedances of a transmission line follows the relation (Z1 = Z2) < Z0 Z1 = Z2 = Z0 (Z1 = Z2) > Z0 any of the above (Z1 = Z2) < Z0 Z1 = Z2 = Z0 (Z1 = Z2) > Z0 any of the above ANSWER DOWNLOAD EXAMIANS APP
Power Systems The load current in short circuit calculations are neglected because short circuit currents are greatly out of phase with load currents short circuit currents are much larger than load currents nether 1 nor 2 both 1 and 2 short circuit currents are greatly out of phase with load currents short circuit currents are much larger than load currents nether 1 nor 2 both 1 and 2 ANSWER DOWNLOAD EXAMIANS APP