Irrigation Engineering If the optimum depth of kor watering for a crop is 15.12 cm, the outlet factor for the crop for four week period in hectares per cumec, is 1700 1500 1400 1600 1700 1500 1400 1600 ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering The net head under which the turbine reaches its peak efficiency at synchronous speed is called design head rated head operating head gross head design head rated head operating head gross head ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering A hyetograph is a graphical representation of rainfall intensity and time rainfall depth and time cumulative rainfall and time discharge and time rainfall intensity and time rainfall depth and time cumulative rainfall and time discharge and time ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering If B and d are the bed width and depth of a channel in meters, the combined losses due to evaporation and seepage in cumecs per kilometer length of the channel, is (1/50) × (B + d)2/3 (1/200) × (B + d)2/3 (1/100) × (B + d)2/3 (1/150) × (B + d)2/3 (1/50) × (B + d)2/3 (1/200) × (B + d)2/3 (1/100) × (B + d)2/3 (1/150) × (B + d)2/3 ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering Pick up the incorrect statement from the following. Culturable commanded area is the gross area of an irrigation canal system less Forest area Fallow land Populated area Alkaline area Forest area Fallow land Populated area Alkaline area ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering The crest level of a canal diversion head work, depends upon F.S.L. of the canal All listed here Discharge perimeters Pond level F.S.L. of the canal All listed here Discharge perimeters Pond level ANSWER DOWNLOAD EXAMIANS APP