Irrigation Engineering Hydrograph is the graphical representation of rainfall and time runoff and time ground waterflow and time surface runoff and time rainfall and time runoff and time ground waterflow and time surface runoff and time ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering If straight sides of a triangular section of a lined canal with circular bottom of radius R, make an angle θ with horizontal, the area of its cross-section, is R2 (θ + tan θ) R2 (θ + cot θ) R (θ + cot θ) R (θ + tan θ) R2 (θ + tan θ) R2 (θ + cot θ) R (θ + cot θ) R (θ + tan θ) ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering Silt excluders are constructed on the canal bed upstream of head regulator river bed upstream of head regulator canal bed downstream of head regulator river bed downstream of head regulator canal bed upstream of head regulator river bed upstream of head regulator canal bed downstream of head regulator river bed downstream of head regulator ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering The state of the soil when plants fail to extract sufficient water for their requirements, is None of these Maximum saturated point Ultimate utilization point Permanent wilting point None of these Maximum saturated point Ultimate utilization point Permanent wilting point ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering Lacey's equation for calculating flood discharge in rivers, is V = 10.8 R1/3 S2/3 V = 10.8 R2/3 S1/3 V = 10.8 R1/2 S1/2 V = 10.8 R2/3 S1/2 V = 10.8 R1/3 S2/3 V = 10.8 R2/3 S1/3 V = 10.8 R1/2 S1/2 V = 10.8 R2/3 S1/2 ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering Pick up the correct statement from the following and answer All of these In a level crossing, a cross regulator is provided on the canal below the crossing In a level crossing a regulator is provided across the drainage at its down-stream In a level crossing, a crest with its top at the canal F.S.L. is provided across the drainage at its up-stream junction with canal All of these In a level crossing, a cross regulator is provided on the canal below the crossing In a level crossing a regulator is provided across the drainage at its down-stream In a level crossing, a crest with its top at the canal F.S.L. is provided across the drainage at its up-stream junction with canal ANSWER DOWNLOAD EXAMIANS APP