Irrigation Engineering
If d1 is the depth of cutting, d2 is the height of the bank from bed level r2 : 1 and r1 : 1 are the slopes in filling and cutting respectively, the horizontal distance n between the bed and bank, is

x = d1 / r1
x = d2 / r2
x = r1 d1
x = r2 d2

ANSWER DOWNLOAD EXAMIANS APP

Irrigation Engineering
Pick up the correct statement from the following and answer

In a level crossing, a cross regulator is provided on the canal below the crossing
All of these
In a level crossing, a crest with its top at the canal F.S.L. is provided across the drainage at its up-stream junction with canal
In a level crossing a regulator is provided across the drainage at its down-stream

ANSWER DOWNLOAD EXAMIANS APP