DGVCL Exam Paper (11-12-2011) If a 5 A fuse is blown frequently in a house lighting circuit, it is required to Insert a fuse of higher current rating Check the load Reduce the load Insert a fuse of higher voltage rating Insert a fuse of higher current rating Check the load Reduce the load Insert a fuse of higher voltage rating ANSWER DOWNLOAD EXAMIANS APP
DGVCL Exam Paper (11-12-2011) The transient stability of a power system can be improved by Phase shifting transformer Increasing the turbine valve opening Excitation control Single pole switching of circuit breakers Phase shifting transformer Increasing the turbine valve opening Excitation control Single pole switching of circuit breakers ANSWER DOWNLOAD EXAMIANS APP
DGVCL Exam Paper (11-12-2011) The purpose of interpoles in DC machines is to nullify Both the cross-magnetizing mmf and the reactance voltage The demagnetizing effect of armature mmf The reactance voltage The cross-magnetizing effect of armature mmf Both the cross-magnetizing mmf and the reactance voltage The demagnetizing effect of armature mmf The reactance voltage The cross-magnetizing effect of armature mmf ANSWER EXPLANATION DOWNLOAD EXAMIANS APP interpoles is widely use to improve commutationplace between main poles fitted to yokefunctions:to neutralize armature mmf in commutating zoneto produce some flux in commutating zone
DGVCL Exam Paper (11-12-2011) Which of the following correctly represents the sequence of operations of isolator, circiut breaker and earthing switch while opening a circuit? Close circuit breaker-close isolator - open earthing switch Open isolator close circuit breaker-open earthing switch Open circuit breaker-open isolator-close earthing switch Close earthing switch - open ciruit- breaker-open islotor Close circuit breaker-close isolator - open earthing switch Open isolator close circuit breaker-open earthing switch Open circuit breaker-open isolator-close earthing switch Close earthing switch - open ciruit- breaker-open islotor ANSWER DOWNLOAD EXAMIANS APP
DGVCL Exam Paper (11-12-2011) A fixed step by step procedure for finding the solution of a problem on computer is called Algorithm Hardware Logic Software Algorithm Hardware Logic Software ANSWER DOWNLOAD EXAMIANS APP
DGVCL Exam Paper (11-12-2011) Bulk power transmission over long HVDC lines are preferred on account of Simple protection Minimum line power losses Low cost of HVDC terminals No harmonic problems Simple protection Minimum line power losses Low cost of HVDC terminals No harmonic problems ANSWER DOWNLOAD EXAMIANS APP