DGVCL Exam Paper (11-12-2011) If a 5 A fuse is blown frequently in a house lighting circuit, it is required to Check the load Insert a fuse of higher current rating Insert a fuse of higher voltage rating Reduce the load Check the load Insert a fuse of higher current rating Insert a fuse of higher voltage rating Reduce the load ANSWER DOWNLOAD EXAMIANS APP
DGVCL Exam Paper (11-12-2011) The insulation coordination for UHV lines (above 500 kV) is done based on Switching surges Lightning and switching surges Lightning surges Voltage level of the line Switching surges Lightning and switching surges Lightning surges Voltage level of the line ANSWER DOWNLOAD EXAMIANS APP
DGVCL Exam Paper (11-12-2011) Which motor is used to start heavy loads? Shunt motor Series motor Differentially compounded motor Cumulatively compounded motor Shunt motor Series motor Differentially compounded motor Cumulatively compounded motor ANSWER EXPLANATION DOWNLOAD EXAMIANS APP Torque in d.c motor = k* φ * IaIn series motor φ α IaTα I²starting torque of dc series motor is high
DGVCL Exam Paper (11-12-2011) If the voltage at the two ends of a line are 132 kV, and its reactance is 40 Ω, the stability limit of the line is 500 MW 217.8 MW 435.6 MW 251.5 MW 500 MW 217.8 MW 435.6 MW 251.5 MW ANSWER DOWNLOAD EXAMIANS APP
DGVCL Exam Paper (11-12-2011) The circuit breaker generally used in railway traction is Bulk Oil CB Air break CB Minimum Oil CB Vacuum CB Bulk Oil CB Air break CB Minimum Oil CB Vacuum CB ANSWER DOWNLOAD EXAMIANS APP
DGVCL Exam Paper (11-12-2011) Bulk power transmission over long HVDC lines are preferred on account of Low cost of HVDC terminals Minimum line power losses No harmonic problems Simple protection Low cost of HVDC terminals Minimum line power losses No harmonic problems Simple protection ANSWER DOWNLOAD EXAMIANS APP