GETCO Exam Paper (22-07-2015) I _____ tennis every Sunday morning am playing am play playing play am playing am play playing play ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (22-07-2015) Penalty factor in power system economical operation is measure of all are correct fuel cost Line loss generation cost all are correct fuel cost Line loss generation cost ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (22-07-2015) The steady state stability of the power systems is most effected by stability of generator power factor of the load voltage at generator bus transmission line reactance stability of generator power factor of the load voltage at generator bus transmission line reactance ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (22-07-2015) An over-current relay of current rating 5 A and setting 150% is connected to a 200/5 A CT. Then the relay to pickup, the line current required is 200 300 100 150 200 300 100 150 ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (22-07-2015) The Z matrix of 2 port network is given by [0.9 0.2 : 0.2 0.6]. The element Y22 of the corresponding Y matrix of the same network is given by 1.2 0.4 1.8 -0.4 1.2 0.4 1.8 -0.4 ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (22-07-2015) What is the Antonyms of 'ENIGMA'? Energetic Mystery Demise Understood Energetic Mystery Demise Understood ANSWER DOWNLOAD EXAMIANS APP