Process Control and Instrumentation High temperature of around 2000°C of incandescent gas mantles is measured by a/an Optical pyrometer Radiation pyrometer Specially designed thermocouple None of these Here Optical pyrometer Radiation pyrometer Specially designed thermocouple None of these Here ANSWER DOWNLOAD EXAMIANS APP
Process Control and Instrumentation Resistance of a gas in a vessel is given by (where, P = pressure, V = volume of the vessel, n = no. of moles of the gas, R = gas constant) nRT/V nRT/P V/nRT p/nRT nRT/V nRT/P V/nRT p/nRT ANSWER DOWNLOAD EXAMIANS APP
Process Control and Instrumentation Starting temperature of optical radiation pyrometer is __________ °C. 800 1500 1200 400 800 1500 1200 400 ANSWER DOWNLOAD EXAMIANS APP
Process Control and Instrumentation Flow rate of sludge is not measured by a/an Kennison nozzle Open weir Both B & C Orificemeter Kennison nozzle Open weir Both B & C Orificemeter ANSWER DOWNLOAD EXAMIANS APP
Process Control and Instrumentation Gain margin is equal to the Gain in P controller Amplitude ratio Reciprocal of amplitude ratio Gain in P-I controller Gain in P controller Amplitude ratio Reciprocal of amplitude ratio Gain in P-I controller ANSWER DOWNLOAD EXAMIANS APP
Process Control and Instrumentation The pressure sensing element of elastic type pressure gauge is never made in the form of a Bellow Bourdon tube Strip Diaphragm Bellow Bourdon tube Strip Diaphragm ANSWER DOWNLOAD EXAMIANS APP