GETCO Exam Paper (30-11-2008)

GETCO Exam Paper (30-11-2008)
Graded time lag over current relaying without directional features can be employed for protection of

ring mains
radial feeders
parallel feeders
none of these

ANSWER DOWNLOAD EXAMIANS APP

GETCO Exam Paper (30-11-2008)
The recovery voltage will be maximum for p.f. of

0.5
zero
unity
0.707

ANSWER DOWNLOAD EXAMIANS APP

GETCO Exam Paper (30-11-2008)
On a long high voltage transmission line with heavy load, VAR compensation can be provided by using

shunt inductive reactors
series capacitors
series inductive reactors
shunt capacitors

ANSWER DOWNLOAD EXAMIANS APP

GETCO Exam Paper (30-11-2008)
When transformers or switchgears are to be installed in a transmission line, the poles used are

J type
H type
I type
L type

ANSWER DOWNLOAD EXAMIANS APP

GETCO Exam Paper (30-11-2008)
The Indian National Congress had its birth in the year

1875
1775
1757
1885

ANSWER DOWNLOAD EXAMIANS APP

GETCO Exam Paper (30-11-2008)
In an overhead transmission line, wave traps are used for the detection of the _____ signals.

fault current
fault power
fault voltage
carrier

ANSWER DOWNLOAD EXAMIANS APP
MORE MCQ ON GETCO Exam Paper (30-11-2008)

DOWNLOAD APP

  • APPLE
    from app store
  • ANDROID
    from play store

SEARCH

LOGIN HERE


  • GOOGLE

FIND US

  • 1.70K
    FOLLOW US
  • EXAMIANSSTUDY FOR YOUR DREAMS.
  • SUPPORT :SUPPORT EMAIL ACCOUNT : examians@yahoo.com

OTHER WEBSITES

  • GUJARATI MCQ
  • ACCOUNTIANS

QUICK LINKS

  • HOME
  • QUIZ
  • PRIVACY POLICY
  • DISCLAIMER
  • TERMS & CONDITIONS
  • CONTACT US
↑