Irrigation Engineering For supplying water to rabi crop, kharif crop and sugarcane, the channel is designed for a capacity equal to the greater of the water requirement of rabi and sugarcane or kharif and sugarcane rabi and kharif or sugarcane rabi or kharif rabi or kharif or sugarcane rabi and sugarcane or kharif and sugarcane rabi and kharif or sugarcane rabi or kharif rabi or kharif or sugarcane ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering Lane's weighted creep theory assumes Equal weightage to horizontal and vertical creeps Double weightage to horizontal creep and one weightage to vertical creep Triple weightage to horizontal creep and one weightage to vertical creep Triple weightage to vertical creep and one weightage to horizontal creep Equal weightage to horizontal and vertical creeps Double weightage to horizontal creep and one weightage to vertical creep Triple weightage to horizontal creep and one weightage to vertical creep Triple weightage to vertical creep and one weightage to horizontal creep ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering The width of a meander belt is the transverse distance between Two banks of meandering river Apex point and the crossing None of these Apex point of one curve and apex point of the reserve curve Two banks of meandering river Apex point and the crossing None of these Apex point of one curve and apex point of the reserve curve ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering The uplift pressure on the roof of an inverted syphon, is maximum when Canal is running dry Drain is running with H.F.L. Canal is running with F.S.L. Drain in running dry Canal is running dry Drain is running with H.F.L. Canal is running with F.S.L. Drain in running dry ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering Tortuosity of a meandering river is always equal to 1 greater than 1 less than 1 less than or equal to 1 equal to 1 greater than 1 less than 1 less than or equal to 1 ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering The uplift pressure on a dam can be controlled by i) constructing cutoff under upstream face ii) constructing drainage channels bet-ween the dam and its foundation iii) by pressure grouting in foundation The corret answer is both (i) and (ii) only (i) both (i) and (iii) (i), (ii) and (iii) both (i) and (ii) only (i) both (i) and (iii) (i), (ii) and (iii) ANSWER DOWNLOAD EXAMIANS APP