Irrigation Engineering Cross regulators in main canals are provided To overflow excessive flow water To increase water head upstream when a main canal is running with low supplies To regulate water supply in the distributaries None of these To overflow excessive flow water To increase water head upstream when a main canal is running with low supplies To regulate water supply in the distributaries None of these ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering For smooth entry of water in a canal, the angle between head regulator and water is generally kept 90° 80° 120° 110° 90° 80° 120° 110° ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering A hydroelectric scheme operating under a head of 80 m will be classified as None of these high head scheme medium head scheme low head scheme None of these high head scheme medium head scheme low head scheme ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering When a canal is carried over a natural drainage, the structure provided, is known as Aqueduct Syphon Super passage Syphon-aqueduct Aqueduct Syphon Super passage Syphon-aqueduct ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering A counter berm is A vertical benching provided on the inner edge of the bank A vertical benching provided on the outer edge of the bank A horizontal benching provided on the outside slope A horizontal benching provided on the inside slope A vertical benching provided on the inner edge of the bank A vertical benching provided on the outer edge of the bank A horizontal benching provided on the outside slope A horizontal benching provided on the inside slope ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering The uplift pressure on a dam can be controlled by i) constructing cutoff under upstream face ii) constructing drainage channels bet-ween the dam and its foundation iii) by pressure grouting in foundation The corret answer is both (i) and (iii) only (i) both (i) and (ii) (i), (ii) and (iii) both (i) and (iii) only (i) both (i) and (ii) (i), (ii) and (iii) ANSWER DOWNLOAD EXAMIANS APP