Chemical Engineering Plant Economics Equipment installation cost in a chemical process plant ranges from __________ percent of the purchased equipment cost. 55 to 65 35 to 45 70 to 80 10 to 20 55 to 65 35 to 45 70 to 80 10 to 20 ANSWER DOWNLOAD EXAMIANS APP
Chemical Engineering Plant Economics Payback period All of these Is the length of time over which the earnings on a project equals the investment And economic life of a project are the same Is affected by the variation in earnings after the recovery of the investment All of these Is the length of time over which the earnings on a project equals the investment And economic life of a project are the same Is affected by the variation in earnings after the recovery of the investment ANSWER DOWNLOAD EXAMIANS APP
Chemical Engineering Plant Economics Maximum production start up cost for making a chemical plant operational is about __________ percent of the fixed capital cost. 30 10 1 5 30 10 1 5 ANSWER DOWNLOAD EXAMIANS APP
Chemical Engineering Plant Economics Annual depreciation cost are not constant when, the __________ method of depreciation calculation is used. Sinking fund Straight line Present worth Declining balance Sinking fund Straight line Present worth Declining balance ANSWER DOWNLOAD EXAMIANS APP
Chemical Engineering Plant Economics In an ordinary chemical plant, electrical installation cost may be about Neither A nor B Either A or B 3-10% of fixed capital investment 10-15% of purchased equipment cost Neither A nor B Either A or B 3-10% of fixed capital investment 10-15% of purchased equipment cost ANSWER DOWNLOAD EXAMIANS APP
Chemical Engineering Plant Economics If an amount R is paid at the end of every year for 'n' years, then the net present value of the annuity at an interest rate of i is R(1 + i)n R/(1 + i)n [((1 + i)n - 1)/i(1 + i)n] R[((1 + i)n - 1)/i] R(1 + i)n R/(1 + i)n [((1 + i)n - 1)/i(1 + i)n] R[((1 + i)n - 1)/i] ANSWER DOWNLOAD EXAMIANS APP