Chemical Engineering Plant Economics Equipment installation cost in a chemical process plant ranges from __________ percent of the purchased equipment cost. 55 to 65 10 to 20 70 to 80 35 to 45 55 to 65 10 to 20 70 to 80 35 to 45 ANSWER DOWNLOAD EXAMIANS APP
Chemical Engineering Plant Economics __________ of depreciation calculation does not take into account the interest on investments. All of these Present worth method Sinking fund method Sum of the years-digits method All of these Present worth method Sinking fund method Sum of the years-digits method ANSWER DOWNLOAD EXAMIANS APP
Chemical Engineering Plant Economics Annual depreciation costs are constant, when the __________ method of depreciation calculation is used. Sum of the years digit Straight line None of these Declining balance Sum of the years digit Straight line None of these Declining balance ANSWER DOWNLOAD EXAMIANS APP
Chemical Engineering Plant Economics Which of the following is not a component of depreciation cost? Repairs and maintenance cost Loss due to accident/breakdown in the machinery Loss due to decrease in the demand of product Loss due to obsolescence of the equipment Repairs and maintenance cost Loss due to accident/breakdown in the machinery Loss due to decrease in the demand of product Loss due to obsolescence of the equipment ANSWER DOWNLOAD EXAMIANS APP
Chemical Engineering Plant Economics Pick out the correct statement. Unamortised cost is the difference between the original cost of a property and all the depreciation charges made to dat Scrap value is the net amount of money obtainable from the sale of used property over and above any charges involved in its removal & sale Difference between income and expense is termed as gross revenue Sum-of-the-years-digits methods of depreciation calculation accounts for the interest on the investment Unamortised cost is the difference between the original cost of a property and all the depreciation charges made to dat Scrap value is the net amount of money obtainable from the sale of used property over and above any charges involved in its removal & sale Difference between income and expense is termed as gross revenue Sum-of-the-years-digits methods of depreciation calculation accounts for the interest on the investment ANSWER DOWNLOAD EXAMIANS APP
Chemical Engineering Plant Economics The total investment in a project is Rs. 10 lakhs and the annual profit is 1.5 lakhs. If the project life is 10 years, then the simple rate of return on investment is 150% 1.5% 10% 15% 150% 1.5% 10% 15% ANSWER DOWNLOAD EXAMIANS APP