Engineering Economics A manufacturing firm maintains one product assembly line to produce signal generators. Weekly demand for the generators is 35 units. The line operates for 7 hours per day, 5 days per week. What is the maximum production time per unit in hours required of the line to meet the demand? 1.4 hours per unit 1.2 hours per unit 1.6 hours per unit 1.0 hour per unit 1.4 hours per unit 1.2 hours per unit 1.6 hours per unit 1.0 hour per unit ANSWER DOWNLOAD EXAMIANS APP
Engineering Economics The institute of Electronics and Communications Engineers of the Philippines (IECEP) is planning to put up its own building. Two proposals being considered are:A. The construction of the building now to cost P 400,000B. The construction of a smaller building now to cost P300,000 and at the end of 5 years, an extension to be added to cost P 200,000.By how much is proposal B more economical than proposal A if interest rate is 20% and depreciation to be neglected? P 19,122.15 P 19,624.49 P 19,423.69 P 19,518.03 P 19,122.15 P 19,624.49 P 19,423.69 P 19,518.03 ANSWER DOWNLOAD EXAMIANS APP
Engineering Economics The monthly demand for ice cans being manufactured by Mr. Camus is 3200 pieces. With a manual operated guillotine, the unit cutting cost is P25.00. An electrically operated hydraulic guillotine was offered to Mr. Camus at a price of P275,000.00 and which cuts by 30% the unit cutting cost. Disregarding the cost of money, how many months will Mr. Camus be able to recover the cost of the machine if he decides to buy now? 10 months 12 months 11 months 13 months 10 months 12 months 11 months 13 months ANSWER DOWNLOAD EXAMIANS APP
Engineering Economics A factory operator bought a diesel generator set for P 10,000.00 and agreed to pay the dealer uniform sum at the end of each year for 5 years at 8% interest compounded annually, that the final payment will cancel the debt for principal and interest. What is the annual payment? P 2,500.57 P 2,540.56 P 2,504.57 P 2,544.45 P 2,500.57 P 2,540.56 P 2,504.57 P 2,544.45 ANSWER DOWNLOAD EXAMIANS APP
Engineering Economics Shell Philippines, a multinational company, has a total gross income for a particular year of P 50,000,000. The taxable income after taking all deductions except for depletion is P 18,500,000. What is the allowable depletion allowance for that particular year? Take percentage of gross income for oil as 22%. P 9,228.45 P 9,250.00 P 9,308.45 P 9,358.41 P 9,228.45 P 9,250.00 P 9,308.45 P 9,358.41 ANSWER DOWNLOAD EXAMIANS APP