Engineering Economics
A manufacturing firm maintains one product assembly line to produce signal generators. Weekly demand for the generators is 35 units. The line operates for 7 hours per day, 5 days per week. What is the maximum production time per unit in hours required of the line to meet the demand?

1.0 hour per unit
1.2 hours per unit
1.4 hours per unit
1.6 hours per unit

ANSWER DOWNLOAD EXAMIANS APP

Engineering Economics
In case of bankruptcy of a partnership,

The partners are not liable for the liabilities of the partnership
The partnership assets (excluding the partners personal assets) only will be used to pay the liabilities
The partners personal assets are attached to the debt of the partnership
The partners nay sell stock to generate additional capital

ANSWER DOWNLOAD EXAMIANS APP

Engineering Economics
Pick up the correct reason for making conceptual (or preliminary) estimate from the following:

All of these
To have a check on a definitive cost estimate
To check quotations from contractors and/or sub-contractors
To compute target estimate for the owner while drawing and specifications are in initial stage

ANSWER DOWNLOAD EXAMIANS APP