Engineering Economics The more critical (or severe) test of the firm's liquidity can be judged by: Current ratio Debts ratio Acid-Test (or Quick) ratio Liquidity ratio Current ratio Debts ratio Acid-Test (or Quick) ratio Liquidity ratio ANSWER DOWNLOAD EXAMIANS APP
Engineering Economics In a cash flow series: Either an increase or decrease in the amount of a cash flow is called the gradient Uniform gradient signifies that an income or disbursement changes by the same amount in each interest period The gradient in the cash flow may be positive or negative All of these Either an increase or decrease in the amount of a cash flow is called the gradient Uniform gradient signifies that an income or disbursement changes by the same amount in each interest period The gradient in the cash flow may be positive or negative All of these ANSWER DOWNLOAD EXAMIANS APP
Engineering Economics A VOM has a selling price of P 400. If its selling price is expected to decline at a rate of 10% per annum due to obsolescence, what will be its selling price after 5 years? P 236.20 P 222.67 P 231.56 P 212.90 P 236.20 P 222.67 P 231.56 P 212.90 ANSWER DOWNLOAD EXAMIANS APP
Engineering Economics The monthly demand for ice cans being manufactured by Mr. Camus is 3200 pieces. With a manual operated guillotine, the unit cutting cost is P25.00. An electrically operated hydraulic guillotine was offered to Mr. Camus at a price of P275,000.00 and which cuts by 30% the unit cutting cost. Disregarding the cost of money, how many months will Mr. Camus be able to recover the cost of the machine if he decides to buy now? 10 months 13 months 12 months 11 months 10 months 13 months 12 months 11 months ANSWER DOWNLOAD EXAMIANS APP
Engineering Economics The key to profitable operation for project cost control, is: To keep the project cost equal to original cost estimate None of these To keep the project cost within the cost budget and knowing when and where job costs are deviating To keep the project cost equal to subsequent construction budget To keep the project cost equal to original cost estimate None of these To keep the project cost within the cost budget and knowing when and where job costs are deviating To keep the project cost equal to subsequent construction budget ANSWER DOWNLOAD EXAMIANS APP