Waste Water Engineering Dry weather flow is: Average monthly rate of flow Water supply allowance per capita Average daily rate of flow Average annual rate of flow Average monthly rate of flow Water supply allowance per capita Average daily rate of flow Average annual rate of flow ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering For drainage pipes in buildings the test applied before putting them to use, is Water test All listed here Smoke test Straightness test Water test All listed here Smoke test Straightness test ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering For efficient working of a sewer, it must be ensured that A maximum velocity of 0.90 m/sec, is maintained at its maximum flow Both (A) and (B) Minimum velocity of 0.45 m/sec, is maintained at its minimum flow Neither (A) nor (B) A maximum velocity of 0.90 m/sec, is maintained at its maximum flow Both (A) and (B) Minimum velocity of 0.45 m/sec, is maintained at its minimum flow Neither (A) nor (B) ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The flow velocity in detritus tanks is 1.25 m/sec None of these 0.09 m/sec 0.05 m/sec 1.25 m/sec None of these 0.09 m/sec 0.05 m/sec ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering Ventilating shafts are provided to a sewer line at every 200 m 100 m 150 m 300 m 200 m 100 m 150 m 300 m ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering For a peak discharge of 0.0157 cumec, with a velocity of 0.9 m/sec, the diameter of the sewer main, is 12 cm 10 cm 15 cm 18 cm 12 cm 10 cm 15 cm 18 cm ANSWER DOWNLOAD EXAMIANS APP