Waste Water Engineering Dry weather flow is: Average monthly rate of flow Average daily rate of flow Average annual rate of flow Water supply allowance per capita Average monthly rate of flow Average daily rate of flow Average annual rate of flow Water supply allowance per capita ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering To maintain aerobic biological activity, the moisture content of the compost mass should be about 0.55 0.45 0.6 0.5 0.55 0.45 0.6 0.5 ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering Inter-distance between ventilation columns in a sewer line is kept 50 m to 100 m 150 m to 300 m 25 to 50 m 100 m to 150 m 50 m to 100 m 150 m to 300 m 25 to 50 m 100 m to 150 m ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The screens are fixed Perpendicular to the direction of flow At an angle 30° to 60° to the direction of flow None of these Parallel to the direction of flow Perpendicular to the direction of flow At an angle 30° to 60° to the direction of flow None of these Parallel to the direction of flow ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The detention time (t) of a settling tank, may be defined as the time required for None of these A particle to travel along its length The flow of sewage to fill the tank A particle to travel from top surface to bottom sludge zone None of these A particle to travel along its length The flow of sewage to fill the tank A particle to travel from top surface to bottom sludge zone ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The sewer which received discharge from two or more main sewers, is known as A trunk sewer An intercepting sewer A main sewer An outfall sewer A trunk sewer An intercepting sewer A main sewer An outfall sewer ANSWER DOWNLOAD EXAMIANS APP