Environmental Engineering Double filtration is used For isolated buildings like pools, hotels etc swimming To increase the filtration slow sand filters capacity of To increase the filtration rapid sand filters capacity of All of these For isolated buildings like pools, hotels etc swimming To increase the filtration slow sand filters capacity of To increase the filtration rapid sand filters capacity of All of these ANSWER DOWNLOAD EXAMIANS APP
Environmental Engineering Assertion A: The consumption of water increases with increase in the distribution pressure.Reason R: Higher distribution pressure causes more loss and waste of waterSelect your answer according to the coding system given below A is true but R is false A is false but R is true Both A and R is true but R is not the correct explanation of A Both A and R is true and R is the correct explanation of A A is true but R is false A is false but R is true Both A and R is true but R is not the correct explanation of A Both A and R is true and R is the correct explanation of A ANSWER DOWNLOAD EXAMIANS APP
Environmental Engineering Which of the following unit works in anaerobic conditions? Sludge digestion tank Sedimentation tank Activated sludge treatment Trickling filters Sludge digestion tank Sedimentation tank Activated sludge treatment Trickling filters ANSWER DOWNLOAD EXAMIANS APP
Environmental Engineering The overflow rate for plain sedimentation tanks is about 1250 to 1500 liters/hour/m² 1000 to 1250 liters/hour/ m² 500 to 750 liters/hour/ m² 1500 to 2000 liters/hour/m² 1250 to 1500 liters/hour/m² 1000 to 1250 liters/hour/ m² 500 to 750 liters/hour/ m² 1500 to 2000 liters/hour/m² ANSWER DOWNLOAD EXAMIANS APP
Environmental Engineering Air binding phenomena in rapid sand filters occur due to Low temperature Higher turbidity in the effluent Excessive negative head Mud ball formation Low temperature Higher turbidity in the effluent Excessive negative head Mud ball formation ANSWER DOWNLOAD EXAMIANS APP
Environmental Engineering Scour valves are provided At every depression and dead ends to drain out the waste water that may collect there At every summit of rising mains At the foot of rising main along the slope to prevent back running of water At street corners to control the flow of water At every depression and dead ends to drain out the waste water that may collect there At every summit of rising mains At the foot of rising main along the slope to prevent back running of water At street corners to control the flow of water ANSWER DOWNLOAD EXAMIANS APP